Calculation method of maximum horizontal movement distance of debris flow in rock landslide
A technology of horizontal motion and calculation method, applied in the direction of design optimization/simulation, special data processing application, etc., can solve problems such as loss, and achieve the effect of improving the applicability of disaster prevention
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] In 1932, Swiss geologist Heim conducted research on the Elm landslide in the Swiss Alps in 1881, and proposed the equivalent friction coefficient of debris flow ( i.e. f e =H / L), the concept of remote movement distance of debris flow was first introduced in the research. Scheidegger (Scheidegger, A.E, On the prediction of the reach and velocity of catastrophic landslides, Rock Mechanics, 1973, 5(4), 231-236) through statistical analysis and landslide data, proposed that there is a relationship between the equivalent friction coefficient and the landslide volume The following functional relationship: lgf e =algV+b. Xu Jinghua (Hsu, K.J, Catastrophic Debris Streams (Sturzstroms) Generated by Rockfalls, GSA Bulletin, 1975, 86(1), 129-140) drew an intensity envelope diagram reflecting the mobility of debris flow, and proposed a hypermotion The concept of distance (excessive travel distance, L_e) is defined as L e =L-H / tan32°.
[0035] T.R.H.Davies (Davies, T.R.H, Spre...
Embodiment 2
[0095] After research, on the basis of the above-mentioned embodiment 1, the following optional other schemes can also be made, the calculation method for the maximum horizontal movement distance of the landslide debris flow provided by the embodiment 2 and the landslide debris provided by the embodiment 1 The calculation method of the maximum horizontal movement distance of the flow is basically the same, and the differences are explained as follows:
[0096] The potential rock landslide has a slope section after it becomes unstable. According to the slope angle of the slope section and the slope distance formula:
[0097] L 斜距 =L / cosα
[0098] The slope distance L of the slope section can be obtained 斜距 , so as to predict the threat area of landslide debris flow.
[0099] Practice example
[0100] The method for calculating the maximum horizontal movement distance of landslide debris flows provided by the present invention is used below to calculate the maximum horizonta...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com