A production simulation method for coordinated operation of power grids in multiple provinces

A simulation method and technology of operation mode, applied in the direction of single-network parallel feeding arrangement, circuit device, AC network circuit, etc., can solve problems such as excessive power exchange of tie lines, inconformity with power grid dispatching mode, unbalanced start-up mode, etc. To achieve the effect of simple operation, avoiding excessive power exchange, and ensuring the independence of operation

Active Publication Date: 2020-05-05
NORTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Coordinated operation of multi-provincial power grids can theoretically combine multiple provinces into one province for unified optimization, but there are the following problems: (1) It does not conform to my country's grid dispatching model with provinces as entities; (2) Multi-provinces When merged into one province for production simulation, it causes uneven start-up
(3) Unbalanced start-up mode leads to excessive power exchange of tie lines

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A production simulation method for coordinated operation of power grids in multiple provinces
  • A production simulation method for coordinated operation of power grids in multiple provinces
  • A production simulation method for coordinated operation of power grids in multiple provinces

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] Such as figure 1 As shown in the present invention, a production simulation method for coordinated operation of multi-provincial power grids includes the following steps:

[0037] 1) Calculate the annual 8760-hour operation mode of each province under the condition of independent operation, and obtain the power exchange curve between each province and the external power grid.

[0038] Among them, when simulating the production and operation of each province, the objective function is to take the lowest overall system cost as:

[0039]

[0040] In the formula: C it is the power generation cost function of thermal power unit i in period t; P i,t is the active output of thermal power unit i in time period t; Q it,up and Q it,off are the start-up and shutdown costs of thermal power unit i in time period t; U it and U i,t-1 are the operating states of thermal power unit i in period t and t-1 respectively; λ 1 , lambda 2 , lambda 3 , lambda 4 Respectively, the pe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A method for simulating the coordinated operation production of multi-province power grids, the method includes the following steps: 1) calculating the independent operation condition production simulation operation mode of each province, and obtaining power exchange curve with an external power grid; 2) according to the production simulation calculation results, calculating the positive and negative regulation capacity that each province can provide to other provinces s under the condition that the starting mode of the thermal power unit is unchanged; 3) according to the power exchange demand and the positive and negative regulation ability of each province and region under the independent operation condition, adopting the quadratic programming model to solve the coordinated operation mode of multiple provinces and regions; 4) gradually increasing the transmission capacity of each province, repeatedly solving the multi-provincial coordination optimization model in the step 3), and calculating the coordinated operation mode of the multi-provincial power grid under different transmission capacity constraint of each provincial section. The method can be used to simulate the coordinated operation and production of multi-provincial power grids adapted to the dispatching mode of provinces in China. It is suitable for the dispatching mode arrangement of power grids in China and thedetermination of the power of provincial tie lines.

Description

technical field [0001] The invention relates to the field of power system planning and operation dispatching, in particular to a production simulation method for coordinated operation of multi-provincial power grids. Background technique [0002] With the large-scale grid integration of wind power, photovoltaic and other new energy power generation, the peak load regulation pressure on the power grid is increasing. Due to the lack of local capacity to absorb new energy, the provinces and regions in the Northwest need to rely on power transmission and multi-province coordinated operation to solve the problem of new energy curtailment. Coordinated operation of multi-provincial power grids can theoretically combine multiple provinces into one province for unified optimization, but there are the following problems: (1) It does not conform to my country's grid dispatching model with provinces as entities; (2) Multi-provinces When merged into one province for production simulation...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/06H02J3/48
CPCH02J3/003H02J3/06H02J3/48H02J2203/20
Inventor 傅旭孙沛许美朋李富春李丁王昭范丽霞杨攀峰
Owner NORTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products