Transportation and arrangement equipment for petroleum transportation pipelines
A technology for transportation pipelines and equipment is applied in the field of transportation and placement equipment for oil transportation pipelines, and can solve the problems of time-consuming and laborious manual handling and difficult placement of oil transportation pipelines.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A transportation arrangement device for oil transportation pipeline, such as Figure 1-5 As shown, it includes a fixed plate 1, a wheel 2, a placement cover 3, a support plate 4, a roll-off plate 5, a placement box 6, a sliding sleeve 7, a baffle plate 8, a first rack 9, a first fixed rod 10, a first A gear 11, crank handle 12, first guide sleeve 13, first guide rail 14, second rack 15, connecting rod 16, roller 17, second fixed rod 18, first slide rail 19, first slider 20, Cone block 21 and handle 22, wheel 2 is provided on the lower side of fixed plate 1, placement sleeve 3 is installed by welding on the upper right side of fixed plate 1, and support plate 4 is installed by welding on the upper left side of fixed plate 1 , the lower right side of the support plate 4 is installed with a roll-off plate 5 by welding, the lower right of the roll-off plate 5 is connected to the upper left side of the placement sleeve 3, and the upper right side of the support plate 4 is in...
Embodiment 2
[0031] A transportation arrangement device for oil transportation pipeline, such as Figure 1-5 As shown, it includes a fixed plate 1, a wheel 2, a placement cover 3, a support plate 4, a roll-off plate 5, a placement box 6, a sliding sleeve 7, a baffle plate 8, a first rack 9, a first fixed rod 10, a first A gear 11, crank handle 12, first guide sleeve 13, first guide rail 14, second rack 15, connecting rod 16, roller 17, second fixed rod 18, first slide rail 19, first slider 20, Cone block 21 and handle 22, wheel 2 is provided on the lower side of fixed plate 1, placement sleeve 3 is installed by welding on the upper right side of fixed plate 1, and support plate 4 is installed by welding on the upper left side of fixed plate 1 , the lower right side of the support plate 4 is installed with a roll-off plate 5 by welding, the lower right of the roll-off plate 5 is connected to the upper left side of the placement sleeve 3, and the upper right side of the support plate 4 is in...
Embodiment 3
[0034] A transportation arrangement device for oil transportation pipeline, such as Figure 1-5 As shown, it includes a fixed plate 1, a wheel 2, a placement cover 3, a support plate 4, a roll-off plate 5, a placement box 6, a sliding sleeve 7, a baffle plate 8, a first rack 9, a first fixed rod 10, a first A gear 11, crank handle 12, first guide sleeve 13, first guide rail 14, second rack 15, connecting rod 16, roller 17, second fixed rod 18, first slide rail 19, first slider 20, Cone block 21 and handle 22, wheel 2 is provided on the lower side of fixed plate 1, placement sleeve 3 is installed by welding on the upper right side of fixed plate 1, and support plate 4 is installed by welding on the upper left side of fixed plate 1 , the lower right side of the support plate 4 is installed with a roll-off plate 5 by welding, the lower right of the roll-off plate 5 is connected to the upper left side of the placement sleeve 3, and the upper right side of the support plate 4 is in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com