A management and control system and project technology, applied in the field of data processing, can solve problems such as heavy input personnel workload, cumbersome manual input methods, and inability to keep track of the actual progress on site, so as to achieve the effect of improving work efficiency and reducing workload

Inactive Publication Date: 2018-07-03
YUNNAN POWER GRID
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Usually, the site of project construction such as tower erection is relatively remote, and the office location is usually a specific location. It needs to go to a specific location for data entry work in a specific period, such as a week, so that the superior management and control department cannot timely understand the site status. The actual progress, and this manual input method is relatively cumbersome, and the workload of the input personnel is huge

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project construction management and control method, device and system
  • Project construction management and control method, device and system
  • Project construction management and control method, device and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0067] First, the idea of ​​the present invention will be explained.

[0068] In the present invention, the management and control system is developed based on the FRP platform of the J2EE architecture, and adopts a distributed multi-layer architecture and a B / S architecture. The FRP platform has built-in a large number of mature components for construction site construction management, which supports the rapid development and safe de...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project construction management and control method, device and system. The method comprises steps: a data input instruction inputted by a user is received in real time, and the data input instruction is sent to a server; a preset template found by the server and matched with the data input instruction is received; the preset template is analyzed to obtain a correspondingdata form; operation on the data form by the user is received to obtain engineering data; and the engineering data are transmitted to the server, wherein the engineering data are a basis for generating a real-time project progress by the server according to a preset algorithm. Thus, as the user can input data in real time according to the needed preset template through a mobile terminal, the server can generate the real-time project progress, a management and control department at a higher level can thus know the current actual progress in real time, and as the data do not need to be recordedmanually, the workload of an input personnel is lessened, and the working efficiency is improved.

Description

technical field [0001] The present invention relates to the technical field of data processing, and more specifically, relates to a method, device and control system for project construction management and control. Background technique [0002] With the continuous development of the national grid, there are more and more various types of project construction. Among many project constructions, tower erection is one of the indispensable project constructions. [0003] In the existing technology, at the site where the tower is erected, various project-related data are manually recorded, such as on-site information filling, etc. After returning to the office from the site, the data is made into a work progress report and sent to the superior The management and control department, the superior management and control department will check the project progress and other information. [0004] Usually, the site of project construction such as tower erection is relatively remote, an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/06
CPCG06Q10/103G06Q50/06
Inventor 颜涛陇源杰余斌
Owner YUNNAN POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products