Comprehensive evaluation method for power receiving engineering construction quality of power customers at 10kv or below
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A comprehensive evaluation and customer-oriented technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as inaccurate and reasonable results, achieve scientific and reasonable evaluation results, save operation and maintenance costs and difficulty
Inactive Publication Date: 2018-03-30
STATE GRID CHONGQING ELECTRIC POWER +1
View PDF0 Cites 6 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0004] The present invention discloses a comprehensive evaluation method for the construction quality of power receiving projects of 10kv and below electric power customers. In the process of fuzzy comprehensive evaluation, the analytic hierarchy process is used to determine the weight of each index, which solves the problem of simply using the expert estimation method in the existing evaluation methods. To determine the weight of the indicator is too much affected by human factors, resulting in the defect that the result is not accurate and reasonable
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0011] The specific content of the present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0012] as attached figure 1 As shown, the present invention provides a method for comprehensive evaluation of the construction quality of power receiving projects of 10kv and below power customers, comprising the following steps:
[0013] S1. Construct an evaluation index system, the evaluation index system includes a number of first-level indicators and b number of second-level indicators, wherein a and b are both natural numbers. Through on-the-spot investigations, data related to the research were collected; on the basis of questionnaire interviews with experts from the marketing department, operation and maintenance department of construction companies and power grid companies, an evaluation index system was established, specifically including three levels Indicators and nineteen secondary indicators, namely a=3, b=19, as ...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The present invention provides a method for comprehensive evaluation of the construction quality of power receiving projects for power customers of 10 kv or below, comprising the following steps: S1, constructing an evaluation index system, the evaluation index system includes a first-level indicators and b second-level indicators, wherein , a and b are both natural numbers, S2, respectively construct a judgment matrix for pairwise comparison between the first-level indicators and the second-level indicators, S3, calculate the weight of each first-level indicator and second-level indicator, S4, establish a comprehensive fuzzy evaluation model, The specific method is for the object to be evaluated, rating the secondary indicators described in step S1 by several experts, S5, calculating the membership matrix R according to the statistical results of step S4, S6, according to the weight of the membership matrix R and the secondary indicators , respectively calculate the evaluation vector of each first-level index, S7, calculate the fuzzy comprehensive vector B according to the weight of the first-level index and the evaluation vector of each first-level index, S8, quantify the score. Using fuzzy comprehensive evaluation method based on AHP, the evaluation result is more scientific and reasonable.
Description
technical field [0001] The invention relates to the field of project construction quality evaluation, in particular to a method for comprehensive evaluation of construction quality of power receiving projects for power customers of 10kV and below. Background technique [0002] Under the new situation that my country's power grid construction is constantly increasing, the position of 10kV and below customer power distribution projects is becoming more and more important. It is necessary to strengthen its project management and improve the quality of project construction in order to better meet the needs of enterprises and people. electricity demand. On the other hand, for the electric power company, the public transformation part of the 10kV and below customer power distribution project must be handed over to the electric power company for operation and maintenance management. In order to ensure that the cost and difficulty of operation and maintenance in the later stage are ...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.