Stair full-cycle lean management construction method

A construction method and a full-cycle technology, applied in data processing applications, instruments, resources, etc., can solve problems such as inability to optimize the arrangement of staircase facing materials, difficult allocation and correction of structural construction deviations, and poor handling of finishing details. Achieve the effect of saving materials and labor costs, improving the quality of engineering details, and reducing on-site cutting

Active Publication Date: 2018-03-13
平安建设集团有限公司 +2
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, in the above-mentioned construction process, it is often difficult to apportion and correct large structural construction...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Stair full-cycle lean management construction method
  • Stair full-cycle lean management construction method
  • Stair full-cycle lean management construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] In order to enable those skilled in the art to better understand the solutions of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention.

[0042] Such as Figure 1-7As shown, a lean management construction method for the whole cycle of stairs includes the following steps: (1) Determine the facing materials and determine the reserved dimensions of the stairs: first, in the construction preparation stage, read the architectural decoration instructions, and compare the building construction drawings with the structural construction Check the drawings carefully, and review the elevation of the stair platform and the start and end positions of the steps in the structural construction drawings; then, according to the architectural construction drawings, classify and record the facing materials, process types, and stair...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a stair full-cycle lean management construction method. The method comprises the following steps of (1) determining finish materials and determining reserved sizes of stairs: according to a building construction graph, performing classified recording on the finish materials, process types and stair numbers, and performing confirmation on reserved thicknesses of finish layers of stair steps according to a structure construction graph; and if the reserved sizes have errors, finely adjusting the stairs; and (2) summarizing orders: performing summarization analysis on the finish materials and the sizes used by different stair numbers, and combining the finish materials with similar specifications to place an order. Through three important construction control processesof stair primary structure deepening, finish material order optimization and finish layer quick and accurate lofting of a stair structure in the whole stair construction cycle, the construction efficiency is effectively improved, the utilization rate of the finish materials is increased, the rework rate is reduced, the material and labor costs are reduced, the full-cycle lean management is realized, and detail requirements of engineering optimization are met.

Description

technical field [0001] The invention belongs to the technical field, and in particular relates to a construction method for full-cycle lean management of stairs. Background technique [0002] In the current building construction, the stair structure construction drawing and the architectural design drawing have the same step initial positioning size. Before the construction, the civil construction workers and the template turn over the deepening of the stair parts, and it is easy to cause quality deviations such as large construction deviations of the stair structure and difficult closing of the later decoration due to insufficient consideration of the decoration effect. In addition, in building construction, the positioning size of the primary structure of the stairs depends largely on the formwork and the construction quality of the on-site carpentry. Before the decoration construction, the surveyors will carry out the dividing line positioning, and the error allocation w...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06G06Q50/08
Inventor 杨士珏肖文杰元文新吴巧民朱秀才沈炯炎马兰兰
Owner 平安建设集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products