Medium-voltage power distribution network accurate-planting method based on three layers of macroscopic networking constraints

A planning and networking technology, applied in the direction of instruments, data processing applications, forecasting, etc., can solve the problems of large space for distribution network frame improvement, high pressure in summer, and inadequate interval management, so as to avoid construction risks, To ensure the reservation of land resources and the effect of simple wiring

Inactive Publication Date: 2018-02-27
重庆星能电气有限公司
View PDF0 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Different from the main network, the distribution network project has a large volume, and it is difficult to coordinate and manage multiple departments such as construction, operation and maintenance, marketing, and scheduling. Layers of skin make it difficult to implement the project
[0003] At present, the main problems in the distribution network are: circuit crossing and circuitous power supply, complex contact relationship, and difficult to find faults; unbalanced equipment load, heavy load, light load, and equipment that does not meet N-1 are relatively concentrated and appear in places with high load density In the area, there is a lot of pressure in the peak summer; the interval management is not in place, and if the interval is exhausted, the substation is still lightly loaded
These problems lead to poor distribution network indicators, such as key indicators such as connection rate and supply transfer rate are lower than the requirements of the guidelines, and there is a lot of room for improvement of the distribution network structure
[0004] In view of the problems existing in the distribution network, in the actual distribution network planning and construction, the "problem-oriented" thinking is usually emphasized. However, due to the lack of goal-oriented theory, there are infinite solutions, which cannot ensure the overall rationality and long-term effectiveness of the planning scheme. cause waste of investment
[0005] In recent years, more and more power supply companies have carried out precise planning and research on distribution networks based on power supply grids, in order to solve the problem of complex wiring of medium-voltage lines and clarify the authority for construction, operation and maintenance scheduling; the grid division of existing distribution networks There are two ways of thinking: one is to divide based on the functional properties of the planned plots, which belongs to the traditional zoning method and is more random, and different planners may obtain completely different planning schemes; the other is to base the power supply capacity of several sets of standard wiring The size and scope of grid division, that is, the method of quantitative or quasi-quantitative division according to the size of the load, but due to the lack of top-level design guidance at the macro level, this idea of ​​​​dividing and conquering with large size and small size often leads to local optimal results, and there are also grids Divide more random problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Medium-voltage power distribution network accurate-planting method based on three layers of macroscopic networking constraints
  • Medium-voltage power distribution network accurate-planting method based on three layers of macroscopic networking constraints
  • Medium-voltage power distribution network accurate-planting method based on three layers of macroscopic networking constraints

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0106] The present invention is a medium-voltage distribution network precise planning method based on three-layer macro networking constraints, and the steps are as follows:

[0107] The first step is to analyze the current situation of the distribution network.

[0108] On the basis of surveying and sorting out the data of the planning area, the current situation of the distribution network is carried out from the three aspects of "grid", "operation" and "equipment", and the technical indicators and effect indicators are sorted, counted and analyzed. Conduct a thorough investigation and analysis and evaluation of the current situation according to the safety standards of power supply, analyze the current distribution network structure level, equipment utilization rate, load supply capacity and equipment technical level elements, and identify weak links to provide a basis for the preparation of subsequent planning, construction and transformation plans for the planned area;

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a medium-voltage power distribution network accurate-planting method based on three layers of macroscopic networking constraints. The medium-voltage power distribution networkaccurate-planting method comprises the following steps of accurate diagnosis of a power distribution network, accurate load prediction, supply zone classification and division in a planned area, transformer substation optimization and planning in the planned area, three layers of macroscopic networking constraining including channel networking, grid networking and main transformer networking and embodying top layer definitiveness of overall networking and the overall relevance of grid racks, establishment of target grid racks based on the networking constraints and distance harmonization of the grid racks. Interstation channel networking based on fertility layout, grid flakiness networking based on nearby contact optimization and overall main-transformer networking based on device utilization rate optimization can be achieved through spatial overall planning and are used as constraints to strengthen the top layer definitiveness of planning results and whole harmonization. Planned target guidance and used equipment utilization principles are strengthened through time length harmonization. The operability, scientificity and accuracy of planned schemes are improved.

Description

technical field [0001] The invention relates to a distribution network planning method, in particular to an accurate planning method for a medium-voltage distribution network based on three-layer macro-network constraints, which is composed of a network, simple in wiring, highly reliable distribution network and saves investment. Background technique [0002] Under the background of new power reform, precise planning has become an important leader in optimizing resource allocation, avoiding investment waste, and improving power grid enterprise and social benefits. Different from the main network, the distribution network project has a large volume, and it is difficult to coordinate and manage multiple departments such as construction, operation and maintenance, marketing, and scheduling. Layer skin, the project is difficult to land. [0003] At present, the main problems existing in the distribution network are as follows: the lines are crossed and detoured for power supply...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/0639G06Q50/06Y04S10/50
Inventor 王主丁王敬宇王卫平李诗春
Owner 重庆星能电气有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products