A scheduling method and device for installation and maintenance work orders
A scheduling method and work order technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as low scheduling efficiency and inability to guarantee the completion rate of work orders
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0101] The concrete steps of embodiment two are as Figure 4 shown, including:
[0102] S400. Determine the workload of each work order and the work capacity value of each installation and maintenance personnel, arrange an installation and maintenance work order for a certain day to the installation and maintenance personnel, that is, determine the assigned work orders of the installation and maintenance personnel, and provide Maintenance personnel plan installation and maintenance routes.
[0103] S401. Acquire the work order information of the newly added work order, and determine the installation and maintenance personnel to be selected for the newly added work order according to the geographic location of the newly added work order.
[0104] S402. Calculate the first remaining workload of each installation and maintenance personnel to be selected.
[0105] S403. Comparing the first remaining workload of each installation and maintenance personnel to be selected with the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com