Sensitivity-analysis-based dispatching plan evaluation method of cascade hydropower station
A technology of sensitivity analysis and scheduling scheme, applied in data processing applications, forecasting, instruments, etc., can solve the problems of runoff and load uncertainty, cannot judge whether the power generation scheduling scheme is robust, etc., and achieve good simulation results.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] The present invention takes the daily power generation scheduling scheme of Qingjiang cascade hydropower stations as Example 1 to verify the effect of the present invention. The specific technical scheme is as follows:
[0066] Step 1. Obtain the daily planning and dispatching scheme of Qingjiang Cascade Hydropower Station;
[0067] The daily plan power generation scheduling scheme of the cascade hydropower station is a power generation scheduling scheme formulated in advance by the operation and dispatching personnel of the hydropower station. This invention mainly evaluates the dispatching scheme using the method of sensitivity analysis after the daily planning scheme is completed. First, the daily plan formulated by the power station should be obtained For the dispatching plan, this embodiment obtains the daily planning plan for Qingjiang cascade hydropower station dispatching on January 2, 2015.
[0068] Step 2. Change the pre-analyzed runoff size to simulate the s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com