Beam transporting method for building of double-deck bridges

A technology for double-layer bridges and beam transport, which is applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of increasing the labor intensity of construction personnel, low U-beam transfer efficiency on the lower layer, and increased labor intensity, so as to reduce construction costs. , The effect of reducing construction steps and reducing labor intensity

Active Publication Date: 2017-11-03
安徽省中冶重工机械有限公司 +2
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the bridge construction industry, especially in the construction of double-deck bridges, for some places, due to the obstruction of objects, the lower U-beams that need to be transported cannot be directly transported to the drop beam position by the beam transporter, but can only be transported to the drop beam near the lower layer. position, and then transfer by means of equipment lifting or laying conveying channels, which leads to low transfer efficiency of the lower U-beam and increases the labor intensity of construction personnel, and there are still potential safety hazards in the transfer
At the same time, when the prior art is building a double-deck bridge, the upper deck and the lower deck interfere with each other. To transport the upper U-beam, it is necessary to lay a delivery track, then transport the upper U-beam through the delivery track, and then remove the delivery track, which not only increases the workload, resulting in increased labor intensity and affecting construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Beam transporting method for building of double-deck bridges
  • Beam transporting method for building of double-deck bridges
  • Beam transporting method for building of double-deck bridges

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] Below with reference to the accompanying drawings, through the description of the embodiments, the specific embodiments of the present invention, such as the shape, structure, mutual position and connection relationship between the various parts, the role and working principle of the various parts, etc., will be further described. Detailed instructions:

[0018] as attached figure 1 - attached image 3 Shown, the present invention is a kind of beam transporting method of double-deck bridge construction, and the beam transporting step of the beam transporting method of described double-deck bridge construction is: 1) on the upper deck 2 of the double deck bridge 1 that has been laid Set the main girder 3 above, support one end of the main girder 3 on the laid upper deck 2, and support the other end of the main girder 1 on the pier 4 in front of the upper deck 2; 2) on the double-deck bridge that has been laid Place the beam transport vehicle 7 on the lower track 6 of t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a beam transporting method for building of double-deck bridges. The beam transporting method includes the steps of firstly, supporting one end of a main beam (3) on an upper deck (2) and supporting the other end of the main beam (3) on a bridge pier (4); secondly, transporting a lower-deck U-beam (8) to the position of a tip (9) of the lower deck through a beam transporting vehicle (7); thirdly, lifting the lower-deck U-beam (8) to move to a lower-deck falling position (10); fourthly, paving a lower-deck rail (6) on the lower-deck U-beam (8), transporting an upper-deck U-beam (11) to the lower-deck rail (6) through a beam transporting vehicle (5), and lifting the upper-deck U-beam (11) and moving it to an upper-deck falling position (12). By the beam transporting method for building of double-deck bridges, the lower-beck U-beam needed to be transported can be transported to the position right above the lower-deck falling position conveniently rapidly, and the upper-deck U-beam for the upper deck can be transported by the aid of the lower-deck rail conveniently rapidly.

Description

technical field [0001] The invention belongs to the technical field of bridge construction technology, and more specifically relates to a beam transporting method for double-deck bridge construction. Background technique [0002] In the bridge construction industry, especially in the construction of double-deck bridges, for some places, due to the obstruction of objects, the lower U-beams that need to be transported cannot be directly transported to the drop beam position by the beam transporter, but can only be transported to the drop beam near the lower layer. position, and then transfer by means of equipment lifting or laying of conveying channels, which leads to low transfer efficiency of the lower U-beam, increases the labor intensity of construction personnel, and there are safety hazards in the transfer. At the same time, when the prior art is building a double-deck bridge, the upper deck and the lower deck interfere with each other. To transport the upper U-beam, it ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 赵建华黄光者柳宜添宋冰泉裘松立林雷洪冯建宗林后宽吕强苏广郑秀娟张晓晔闫玉坤
Owner 安徽省中冶重工机械有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products