Payment terminal embedded software test workload statistics system

An embedded software and payment terminal technology, applied in the field of payment terminal embedded software testing workload statistics system, can solve problems such as low efficiency, insufficient flexibility, and large errors

Active Publication Date: 2017-06-13
福建瑞之付微电子有限公司
View PDF13 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Existing payment terminal embedded software testing requires unit, stress, crossover, performance, compatibility, reliability, usability and other tests for all functional modules, even if there is already a relatively complete set of test cases and test standards provided However, due to the complexity of the embedded system, the difference in the work efficiency of the testers, the difference in the robustness of the tested version, etc., there has not been a more accurate and efficient method to count the test time required to comple

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Payment terminal embedded software test workload statistics system
  • Payment terminal embedded software test workload statistics system
  • Payment terminal embedded software test workload statistics system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The technical solution of the present invention will be specifically described below in conjunction with the accompanying drawings.

[0034]Combined with the analysis of daily testing work and testing process, embedded software testing can first divide the entire system into independent modules according to functions, and then perform unit testing (referring to functional testing) and comprehensive testing (tests other than functional testing) according to the modules. , including: stress, crossover, compatibility, usability testing, etc.). Therefore, according to the divided functional modules, the test case set of the embedded software system is also divided in the same way, and the statistical time is added to the test code, and the execution of each module unit test case and comprehensive test test execution is counted by running the test case time. Then upload the test time to the EXCEL form on the PC. Analyze the number of times a single module needs to be teste...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a payment terminal embedded software test workload statistics system. The system is coordinated with multiple payment terminals carrying software to be tested, and comprises a test task dividing module, a unit test case control module, a comprehensive test case control module, a unit test module, a comprehensive test module, a time statistics module, a task time statistics module, a data uploading unit and a total test workload statistics unit. According to the payment terminal embedded software test workload statistics system, a test workload statistics method which is easy to use, feasible, meticulous, supported by sufficient data and applicable to an embedded software system is provided, and can be flexibly expanded according to newly added test demands.

Description

technical field [0001] The invention relates to payment terminal embedded software test workload statistics, in particular to a payment terminal embedded software test workload statistics system. Background technique [0002] Existing payment terminal embedded software testing requires unit, stress, crossover, performance, compatibility, reliability, usability and other tests for all functional modules, even if there is already a relatively complete set of test cases and test standards provided However, due to the complexity of the embedded system, the difference in the work efficiency of the testers, the difference in the robustness of the tested version, etc., there has not been a more accurate and efficient method to count the test time required to complete the intrusive software test. [0003] The existing statistical test workload methods in the IT industry include: Ad-hoc method, percentage method of development time, analogy method (empirical value method or historica...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F11/36
CPCG06F11/3672
Inventor 林文龙高锵林建
Owner 福建瑞之付微电子有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products