Project management process performance model, construction method thereof and performance model management system

A project management and construction method technology, applied in the project management process performance model and its construction field, which can solve the problems of weak performance model, emphasis on post-event evaluation, and performance model not supporting continuous improvement.

Inactive Publication Date: 2017-05-31
华北计算技术研究所
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) The existing project process performance model focuses on evaluation rather than prediction in terms of application. Its main function is to evaluate the performance benefits of completed projects, etc., and evaluate the impact of various factors in project performance by analyzing human, organizational and other influencing factors. Effect and degree of influence, emphasizing post-event evaluation; existing performance models are slightly weaker in project control and project forecasting, and are generally qualitative forecasts
[0004] (2) Currently, there is no dedicated software project process performance modeling tool. The existing performance modeling tools are general-purpose. The focus is on stakeholders and summarizing factors from all aspects of the organization. For example, the performance prism model tool is based on all interests The evaluation system for the project from the perspective of relevant subjects
[0005] (3) The existing performance model does not support continuous improvement. The existing performance model is for the analysis and statistics of specific completed projects. In practical application, the model basically only adapts to one scale, that is, the qualitative performance of projects within a period of time. The evaluation and prediction of the project cannot be adaptive with the increase of project scale, data volume and data type, and the model cannot be continuously improved
[0006] It can be seen that the application of the above-mentioned existing project management process performance model obviously still has inconvenience and defects, and it is urgent to be further improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project management process performance model, construction method thereof and performance model management system
  • Project management process performance model, construction method thereof and performance model management system
  • Project management process performance model, construction method thereof and performance model management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0069] The project management process performance model of the present invention mainly realizes the application functions of project target prediction and defect distribution estimation by adding variable attributes and adding variable classifications on the basis of the existing model. The specific model construction method is as follows.

[0070] The project management process performance model construction method of the present invention comprises the following steps:

[0071] (1) Define variables: variables are obtained by analyzing the characteristics of the unit and the data of the unit's projects. Variables in the present invention not only include existing model attribute variables, such as personnel, environment, etc., but also add three new variable attributes of standard process tailoring, complexity and work product scale according to the characteristics of the software project; according to the characteristics of the software project, add The variable classificat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method a project management process performance model. The construction method comprises the following steps: (1) analyzing unit features and unit item data conditions to obtain a plurality of variables, and dividing the variables into fluctuation factors and defect influence factors; (2) analyzing the variable data, and confirming whether the variable data can be used in the model construction; (3) constructing a model: A. normality analysis: performing the relationship between each two variables x, and confirming whether the two variables x belong to normal distribution; B, correlation analysis: performing correlation analysis on each x and y, and confirming the correlation strength of x and y; C. variance analysis / regression analysis: performing variance analysis or regression analysis on qualitative or quantitative variables, analyzing y and all x, and extracting a formula of the project management process performance model by using matlab. The invention further discloses a performance model constructed by the method and a performance model management system comprising the model. By adoption of the performance model, the purpose of predicting project target and estimating defect distribution can be realized.

Description

technical field [0001] The invention relates to the technical field of project management process performance evaluation, in particular to a project management process performance model and a construction method thereof. Background technique [0002] The current existing project management process performance model is mainly manifested in the following points: [0003] (1) The existing project process performance model focuses on evaluation rather than prediction in terms of application. Its main function is to evaluate the performance benefits of completed projects, etc., and evaluate the impact of various factors in project performance by analyzing human, organizational and other influencing factors. The role and degree of influence, with emphasis on post-event evaluation; the existing performance model is weaker in project control and project forecasting, and is generally a qualitative forecast. [0004] (2) Currently, there is no dedicated software project process perfo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06
CPCG06Q10/06393
Inventor 关昕劳天马由胡丹
Owner 华北计算技术研究所
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products