Quick site selection method for construction project
A construction project and rapid technology, applied in the direction of instruments, data processing applications, resources, etc., can solve the problems of easy misjudgment, low efficiency, inability to intuitively superimpose the scope of land use, etc., to achieve the effect of improving work efficiency and improving compliance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] figure 1 A schematic flow chart of a rapid site selection method for a construction project provided in this embodiment, as shown in figure 1 As shown, the method follows the steps:
[0054] Determine the initial site: In the current state of land use, in the target area, implement an integrated query of space and attributes, search out the land that meets the requirements of the current land use, and determine the initial site for the construction project site;
[0055] Determine the scope of land use: In the initial site selection of the construction project, through graphic topology calculations, the scope of land use that meets the requirements of land ownership and planning control and has not been issued with a construction land planning permit is reserved;
[0056]Analyze and obtain the refined disk: analyze the ground buildings within the land area, use spatial overlay analysis, remove unqualified land from the initial disk for construction project location, an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com