A stepwise sand adding method for shale gas fracturing
A pressure and step technology, applied in the direction of earthwork drilling, wellbore/well components, production fluid, etc., can solve the problems of increasing construction procedures and engineering costs, sand plugging, affecting the effect of reservoir transformation, etc., to achieve the improvement of liquid sand carrying Efficiency, Increased Net Pressure, Enhanced Effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Table 1 uses the stepwise sand injection pumping procedure (overview) for fracturing a certain shale gas well as a specific description.
[0018] This embodiment includes the following steps:
[0019] (1) Pumping pre-fluid: use surface high-pressure pumping equipment to pump 120 cubic meters (6 wellbore volumes) of pre-fluid into the wellbore, and the liquid enters the formation to create fractures.
[0020] (2) Pump the first sand-adding slug, and after the pre-fluid enters the formation to create fractures, start to add proppant quartz sand to the fracturing fluid to fill the fractures, with 40 cubic meters (2 wellbore volumes) of sand fluid As a sand-adding slug, 62.5% of the volume before the first sand-adding slug is added with sand at a ratio of 1%, and the sand ratio is constant. After the first sand-added slug, 37.5% of the volume is added with sand at a ratio of 2%.
[0021] (3) Pump the first liquid slug, use 35 cubic meters (1.7 wellbore volume) of fracturin...
Embodiment 2
[0029] In this embodiment, the stepwise sand addition method for fracturing is shown in the table below, and the pumping procedure is as follows:
[0030]
[0031] The well is a shale gas horizontal well in the southeastern area of Chongqing. Through the stepped sanding fracturing process, the subsequent sanding space of the wellbore passing through different formations can be effectively predicted, the sand-carrying efficiency of the liquid is improved, and the potential of different formations is initially explored. The critical sanding point provides a reliable basis for subsequent drilling trajectory design and fracturing scheme design. At the same time, at the second sanding slug, the construction pressure is stable and basically remains unchanged, indicating that the formation has good sanding properties and increases Up to 3 different sand ratios, gradually increasing in increments of 1%, increase the sand volume and liquid sand-carrying efficiency in fracturing sti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com