Efficient segmented blasting method in tunneling process
A blasting method and tunneling technology, applied in blasting and other directions, can solve the problems of large blasting vibration, flying stones and noise, and can not achieve shock reduction effect, and achieve the effect of reducing blasting vibration, improving blasting effect, and reducing excavation cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The technical solutions of the present invention will be described below in conjunction with the accompanying drawings and embodiments.
[0021] The Moon Mountain Tunnel in Huangshi is designed as a separate tunnel, with a net height of 5.0m and a net width of 9.75m. The starting and ending pile numbers of the left-line tunnel are ZK3+585~ZK6+700, and the total length is 3115m; the starting and ending pile numbers of the right-line tunnel are ZK3+585~ZK6+ 701, with a total length of 3116m. The geology of the blasting section is the limestone and marl of the Daye Formation of the lower Triassic system, the rock mass is relatively broken, and the rock formation is 330°∠85°. The surrounding environment at the northern end of the tunnel is complex. About 40m to the west of the tunnel on the right, there is an active Chenjiawan substation (110KV substation, affiliated to Huangshi Power Supply Company) and a simple concrete road (4.2m wide) entering and leaving the substation...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com