Splicing structure and construction method of new and old pavement in super high section of expressway extension project
A technology for expansion projects and expressways, which is used in the field of comprehensive solutions for dealing with water damage and damage at the splicing of new and old road surfaces in super high sections. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] Description of pavement structure layer drainage in super-high side widening section of expressway expansion project: The drainage of the new and old pavement widening part of expressway expansion project has always been a difficult problem to solve. The wide part forms a longitudinal joint, and due to the special design of the road arch on the super-high side, the seepage water inside the pavement structure is collected at the junction of the old and new roadbeds. Large areas of water damage will be caused on the wide-spread road surface, which will eventually greatly reduce the performance and service life of the road surface.
[0043] The comprehensive measures of the water damage of the widened section of the present invention are mainly carried out through the following steps:
[0044]1. Make widening steps 1 on the old road. The steps are unfolded from bottom to top along the road bed A, subbase B, semi-rigid base C and surface layer D, and the seams of the old ro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com