Multi-criterion screening method and multi-criterion screening device for metering errors of intelligent watt-hour meters
A smart energy meter and measurement error technology, applied in the direction of measuring devices, measuring electrical variables, instruments, etc., can solve suspicious problems of smart energy meters and achieve the effect of avoiding losses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] figure 1 A flowchart showing a multi-criteria screening method for metering errors of a smart energy meter according to an embodiment of the present disclosure. The method may include the following steps.
[0026] Step 101 , according to the metrology verification regulations, unqualified smart power meters are eliminated from the plurality of smart power meters, and the measurement errors of the remaining smart power meters form a preliminary credible measurement error set. Generally, unqualified smart energy meters can be eliminated based on the national standard measurement and verification procedures adopted in the prior art. The measurement verification regulations can be relatively rigid indicators to ensure that the smart energy meters put into use at least meet the requirements of relevant national laws, regulations and rules. For example, for smart energy meters, you can refer to the "JJG596-2012 Electronic AC Energy Meter Verification Regulations", as long a...
Embodiment 2
[0048] According to the present disclosure, a multi-criteria screening device for metering errors of smart electric energy meters is also disclosed, the multi-criteria screening device may include: a first rejecting device, a first screening device, a second screening device, a second screening device Three screening devices and a second rejecting device.
[0049] The first removing device is used to remove unqualified smart electric energy meters from the plurality of intelligent electric energy meters, and the measurement errors of the remaining intelligent electric energy meters form a preliminary credible measurement error set. The first screening device is used to find suspicious measurement errors from the set of preliminary credible measurement errors based on the Raida criterion, and the suspicious measurement errors found based on the Raida criterion form the first set of suspicious measurement errors. If the number of measurement errors in the first set of doubtful m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com