Road network building and pathfinding method for indoor cross-layer pathfinding
A construction method and cross-layer technology, applied in the field of road network construction and pathfinding for indoor cross-layer pathfinding, to achieve the effect of speeding up the search
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] From figure 2 It can be seen from the figure that the starting point and end point of this search are located on different floors, and the cross-floor path is direct. The steps for performing cross-layer path search are as follows:
[0045] 0. First, search for one or more qualified paths from the cross-layer road network according to the floors to which the starting point and the ending point belong. The conditions that need to be met are that the starting point floor of the path in the cross-layer road network is the same as the starting point floor, and the ending point floor is the same as the ending point floor;
[0046] 1. If there are multiple qualified paths, select the one with the shortest weight;
[0047] 2. Search for the intra-floor path from the starting point to the starting point of the cross-floor path on the departure floor (using the intra-floor path search method);
[0048] 3. Form the cross-layer part of the path from the start point of the cros...
Embodiment 2
[0052] From image 3 It can be seen from the figure that the starting point and the ending point of this search are located on different floors, and the cross-floor path needs to be transferred and cannot be reached directly. The steps for performing cross-layer path search are as follows:
[0053] 0. First, search for one or more qualified paths from the cross-layer road network according to the floors to which the starting point and the ending point belong. The conditions that need to be met are that the starting point floor of the path in the cross-layer road network is the same as the starting point floor, and the ending point floor is the same as the ending point floor;
[0054] 1. If there are multiple qualified paths, select the one with the shortest weight;
[0055] 2. Search for the intra-floor path from the starting point to the starting point of the cross-floor path on the departure floor (using the intra-floor path search method);
[0056] 3. Traversing the cros...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com