Project cost management and control method in power industry
A technology in the power industry and projects, applied in the field of project cost control, can solve problems such as large capital occupation, large business volume, and inability to manage costs, and achieve the effects of saving time and costs, and rationally controlling and allocating
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Such as figure 1 Shown, be a preferred embodiment of the present invention:
[0024] A power industry project cost control system and its implementation method, the method comprising the following steps:
[0025] First, use Nanjing Fujitsu Nanda Software Technology Co., Ltd.'s "Fujitsu Nanda Software Process Integration Management Framework" software product (hereinafter referred to as: SPIF) to collect power enterprise personnel cost information.
[0026] Second, conduct data analysis on personnel cost information in dimensions such as departments and projects.
[0027] Third, based on the data analysis results, form the project cost model of the unit or department. Project cost model indicators include the unit or department's labor distribution rate, personnel expense rate, per capita labor cost, labor cost output coefficient, labor cost sales revenue coefficient, labor cost content, labor cost wage content, and labor productivity of all employees.
[0028] Fourth...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com