Method, system, central office equipment and cpe for adjusting uplink and downlink time allocation
A technology of central office equipment and line time, applied in the field of communication, can solve the problem of low utilization rate of transmission opportunity time, and achieve the effect of improving the utilization rate of transmission resources and improving system performance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0082] In the next-generation digital subscriber line G..fast system, the schematic diagram of adjusting the uplink and downlink time allocation method is as follows Figure 11 The numbers of transmission opportunities and guard intervals in the figure are for illustration only. The implementation process of this method is as follows:
[0083] (1) At the initial moment, all link building CPEs start to transmit uplink data to the central office equipment.
[0084] (2) The central office equipment starts to receive the uplink data of all link-building CPEs. Among them, the time required for uplink transmission cannot exceed the threshold value T max , the threshold can be preset on the CPE and can be adjusted.
[0085] During implementation, due to the difference in the uplink data traffic of each link-building CPE, the time length of uplink transmission is also different. Figure 11 The shaded area shown in indicates no data transmission.
[0086] (3) After the uplink data...
Embodiment 2
[0093] The schematic diagram of the G.fast system to adjust the uplink and downlink time allocation method is as follows Figure 12 The numbers of transmission opportunities and guard intervals in the figure are for illustration only. The implementation process of this method is as follows:
[0094] (1) At the initial moment, the central office equipment determines the optimal downlink transmission opportunity time T of the system according to the downlink data flow of each link ds . It is required that the downlink transmission time of each link cannot exceed T max (The threshold value system will be preset on the central office equipment and can be adjusted), so the optimal value will not exceed T max .
[0095] Among them, the calculation principle of the optimal value is as follows: balance the downlink transmission time and data flow of each channel, so as to maximize the overall time utilization. During implementation, it can be determined according to the following...
Embodiment 3
[0103] The schematic diagram of the G..fast system to adjust the uplink and downlink time allocation method is as follows Figure 13 The numbers of transmission opportunities and guard intervals in the figure are for illustration only. The method is described as follows:
[0104] (1) At the initial moment, the central office device first sends the same MAP message to all CPEs that have established a link. The message can be in the form of broadcast or unicast or embedded in the frame header of the downlink data packet.
[0105] Wherein, the MAP message mainly includes: the time of the uplink transmission opportunity or the downlink transmission opportunity, or the end time of the uplink transmission, or the start time of the downlink transmission in the uplink and downlink cycle to be transmitted.
[0106] The time of the uplink and downlink transmission opportunities in the first MAP message is the initial value of the system, where the uplink transmission time is T us0 , t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com