A boulevard suitable for urban parallel street canyons
A technology of tree-lined roads and canyons, applied in the field of gardens
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Construct a 25m wide boulevard in the parallel street canyon in Putuo District, Shanghai, with street canyon aspect ratio (W / H)=0.6:1.
[0038] The length of the "high and large plaque compound type" isolation green belt 41 for motor vehicles is 12.5m, and the length of the "low type dredging and open type" isolation green belt 42 is 10.0m, and the width is 3.0m;
[0039] Street section structure:
[0040] One-way road forest belt 2 (width 1.5m)—non-motor vehicle "sparse forest flower mirror" isolation green belt 3 (width 2.5m)—motor vehicle "high and large plaque compound type" interval "low type dredging and opening High and low staggered isolation green belt 4 (width 3.0m) - non-motor vehicle "sparse forest flower mirror" isolation green belt 3 (width 2.5m) - one-way road forest belt 2 (width 1.5m)
[0041] The structure of the one-way forest belt 2:
[0042] Large deciduous trees are evenly planted in "point shape", with a height of 8.0-10.0m, a diameter at breast...
Embodiment 2
[0055] Construct a 30m-wide boulevard in the canyon of parallel streets in Pudong New District, Shanghai, with the street canyon aspect ratio (W / H)=0.8:1.
[0056] The motor vehicle "high and large plaque compound type" isolation green belt 41 is 14m long, and the "low dredging and open type" isolation green belt 42 is 11.2m long and 3.5m wide;
[0057] Street section structure:
[0058] One-way road forest belt 2 (width 1.6m)—non-motor vehicle "sparse forest flower mirror" isolation green belt 3 (width 1.8m)—motor vehicle "high and large plaque compound type" interval "low type dredging and opening High and low staggered isolation green belt 4 (width 3.5m) - non-motor vehicle "sparse forest flower mirror" isolation green belt 3 (width 1.8m) - one-way road forest belt 2 (width 1.6m)
[0059] The structure of the one-way forest belt 2:
[0060] Large deciduous trees are evenly planted in "point shape", with a height of 8.0-10.0m, a DBH of 0.20-0.30m, a branch height of 3.0-3....
Embodiment 3
[0073] Construct a 30m wide boulevard in the parallel street canyon in Jiading District, Shanghai, with the street canyon aspect ratio (W / H)=1:1.
[0074] The length of the "high and large patch compound type" isolation green belt for motor vehicles is 15m, and the length of the "low dredging and open type" isolation green belt is 12m and the width is 4.0m;
[0075] Street section structure:
[0076]One-way road forest belt 2 (width 1.8m)—non-motor vehicle "sparse forest flower mirror" isolation green belt 3 (width 2.0m)—motor vehicle "high and large plaque compound type" interval "low type dredging and opening High and low staggered isolation green belt 4 (width 5.0m) - non-motor vehicle "sparse forest flower mirror" isolation green belt 3 (width 2.0m) - one-way road forest belt 2 (width 1.8m)
[0077] The structure of the one-way forest belt 2:
[0078] Large deciduous trees are evenly planted in "point shape", with a height of 8.0-10.0m, a DBH of 0.20-0.30m, a branch heig...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com