Pucch resource mapping, configuration method and device, user equipment, base station
A technology of resource mapping and user equipment, applied in the field of communication, can solve problems such as conflicting mapping positions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] In this embodiment, the following method is used to dynamically configure the frame structure of the UE: the base station dynamically configures the frame structure of the current frame through broadcast signaling, and at the same time uses dedicated control signaling to instruct the UE to use the SIB-1 frame structure or the broadcast signaling indicates frame structure. The frame structure allocated to the R12UE may be different from the frame structure currently actually used by the eNB.
[0064] figure 2 It is a flowchart of a physical uplink control channel resource mapping configuration method according to Embodiment 1 of the present invention. This method is applied to the PUCCH format 1 / 1a / 1b for downlink subframes incompatible with the R10 / R11 frame structure configuration fed back by the specified uplink subframe in the TDD dynamic frame structure scenario. Such as figure 2 As shown, the method includes:
[0065] Step S202, the base station sets resource...
Embodiment 2
[0085] In this embodiment, for the resource mapping scheme of PUCCH, for the convenience of description, the following definitions are made:
[0086] PUCCH format 1 / 1a / 1b for "traditional PDCCH in R10-incompatible downlink subframes" fed back by an uplink subframe in a TDD dynamic frame structure scenario: PUCCH format 1d; a certain TDD dynamic frame structure scenario The PUCCH format 1 / 1a / 1b for the "EPDCCH in the R10 incompatible downlink subframe" fed back by the uplink subframe: PUCCH format 1e.
[0087] This embodiment is aimed at a UCI mapping scheme for a dynamic TDD frame structure allocation scenario (assuming R12 or a later version supports this scenario).
[0088] In order to better understand this embodiment, the problems encountered in UCI mapping in TDD traffic adaptive interference management (InterferenceManagement Traffic Adaptation, referred to as IMTA) will be described below: the existing standard UCI 1 / 1a / 1b adopts channel Mapping is performed in a selec...
Embodiment 3
[0103] Figure 7 It is a flowchart of a physical uplink control channel resource mapping configuration method according to Embodiment 3 of the present invention. This method is applied to PUCCH format 1 / 1a / 1b of EPDCCH, such as Figure 7 As shown, the method includes:
[0104] Step S702, the base station sets a resource mapping rule for mapping the PUCCH, wherein the resource mapping rule includes: inserting UCI resources corresponding to the PUCCH format 1 / 1a / 1b of the EPDCCH into UCI2 / 2a / 2b and UCI 1 / 1a Position between / 1b;
[0105] In step S704, the base station delivers the resource mapping rule to the UE.
[0106] Through the above process, the PUCCH is mapped according to the resource mapping rule of inserting the UCI resource corresponding to the PUCCH format 1 / 1a / 1b of the EPDCCH into the position between UCI2 / 2a / 2b and UCI1 / 1a / 1b, therefore, It can also avoid conflicts with traditional PUCCH mapping positions after the dynamic frame structure is introduced.
[0...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com