A prefabricated floating slab track bed and its construction method
A floating board, prefabricated technology, applied in the field of track beds, can solve the problems that prefabricated long boards are difficult to adapt to changing curve elements, narrow space, and cannot be used, and achieve easy product quality assurance, shortened production cycle, and transportation. And the effect of convenient and quick hoisting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0098] Such as figure 1 , Figure 6 and Figure 7 A section of typical structure of the prefabricated floating slab ballast bed of the present invention shown, to adopt figure 2 The prefabricated short slab of the structure shown is taken as an example of a floating slab. The length of the prefabricated short slab is 3.57m, and anchors 9 are integrated on the prefabricated short slab. In addition, each prefabricated short slab is also provided with four reserved passages Hole 8, the end of the prefabricated short slab along the longitudinal direction of the rail is provided with an installation gap 60 for the plate end vibration isolation device, and the prefabricated short slab is provided with a reserved slot for placing the plate end vibration isolation device under the end of the slab body along the longitudinal direction of the rail 61. For the convenience of description, the prefabricated short slabs are numbered 1, 2 and 3 in sequence, and the structure of the prefa...
Embodiment 2
[0116] Such as Figure 9 The difference between the prefabricated floating slab track bed of the present invention and the first embodiment is that the Figure 8 The prefabricated short slabs of the structure shown are used as floating slabs, and each prefabricated short slab is provided with four placement grooves 27 matched with elastic vibration isolators. In addition, two mid-mounted shears are symmetrically arranged on the end faces of the prefabricated short slabs. Force hinge 31. For ease of description, the prefabricated short slabs are numbered 28, 29 and 30 in sequence, and the structure of the prefabricated floating slab track bed of the present invention will be described in detail below in conjunction with the section view of the prefabricated short slab 29. Such as Figure 9 and Figure 13 As shown, each prefabricated short board is elastically supported by four elastic vibration isolators 25 and four plate end vibration isolation devices 32, and the adjacent ...
Embodiment 3
[0120] Based on the technical principle described in Embodiment 2, such as Figure 14 and Figure 15 As shown, different from the plate end vibration isolation device in Embodiment 2, the plate end vibration isolation device in this example is provided with two groups of plate end longitudinal limiters respectively composed of a longitudinal limit plate 33, an adjusting bolt 35 and a lock nut 34. In addition to the positioning device, two groups of plate end lateral limiting devices are respectively formed by the lateral limiting plate 40, the adjusting bolt 42 and the lock nut 41, wherein the adjusting bolt 42 in the plate end lateral limiting device penetrates the supporting plate 43 Setting, the support plate 43 is welded and fixedly connected with the top plate 10 and the support plate 36 respectively. Apply plate end isolators as described in this example instead of Figure 9 When the plate end vibration isolator 32 constitutes the prefabricated floating slab track bed ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com