Method for spraying to green side slope of hard rock with joints being not developed
A rocky slope, hard technology, applied in the field of ecological restoration, can solve problems such as destroying the ecological environment and affecting the landscape effect, and achieve the effects of good water storage, stable aggregate structure, and environmental coordination.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] Embodiment one, Tangshan Dachengshan Park mountain spraying greening project (construction in 2009)
[0028] The slope of this project is an integral rock slope, the rock is hard, the slope is smooth, and the rock joints are not developed. The area is 9,000 square meters, and the slope is about 60-80o. The location is right at the entrance of the park, which seriously affects the landscape of the park. Effect, adopt the following methods for greening construction.
[0029] (1) Slope surface treatment: remove dangerous stones, pine stones, pumice stones and floating roots, herbaceous plants and garbage that hinder the attachment of the soil matrix on the slope surface. Where there are woody plants, it is appropriate not to hinder the laying of metal mesh pruning of the above-ground parts of woody plants;
[0030] (2) Set up simple scaffolding: the scaffolding starts from the bottom of the slope, using the planted holes as support points;
[0031] (3) Excavating vegeta...
Embodiment 2
[0040] Project name: Mountain spraying greening project in Huayin Village, Chengyang District, Qingdao
[0041] Location: Qingdao City
[0042] Project overview: The entire mountain is a bare granite slope formed after excavating rocks. The total area of the project is about 30,000 square meters, of which 3,500 square meters are undeveloped rock cleavage, with a slope of 75 oIt is difficult to achieve the ideal vegetation establishment effect with ordinary construction methods, so this technology is used to carry out the spraying greening construction method. Construction started in May 2012 and was completed in mid-July.
[0043] The construction method is as follows:
[0044] (1) Set up simple scaffolding: the scaffolding starts from the bottom of the slope, using the planted holes as support points;
[0045] (2) Excavating vegetation holes: Drill vegetation holes on the rock surface with an air-pressure drilling machine. Arranged in plum blossom shape, the drilling a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com