Power distribution network fault repairing resource scheduling method and apparatus

A technology for distribution network faults and resource scheduling, applied in the field of power systems, can solve problems such as easy to obtain local optimal solutions, short repair paths, and few factors.

Active Publication Date: 2015-02-11
NARI TECH CO LTD +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, this genetic algorithm-based repair resource scheduling strategy either takes the shortest repair path or takes the fault and outage load as the objective function. The genetic algorithm considers fewer factors and cannot meet the multi-objective requirements of scheduling. When the calculation sample space involved is large, it is difficult to converge in a short time, and it is easy to obtain a local optimal solution, thereby reducing the scheduling efficiency of distribution network fault repair resource scheduling and the overall utilization of repair resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power distribution network fault repairing resource scheduling method and apparatus
  • Power distribution network fault repairing resource scheduling method and apparatus
  • Power distribution network fault repairing resource scheduling method and apparatus

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 300

[0068] The foregoing description is a description of the method embodiment of the present application. Correspondingly, the embodiment of the present application also provides a distribution network fault recovery resource scheduling device. See attached image 3 , which shows a structural block diagram of a distribution network fault repair resource scheduling device implemented in the present application. The device embodiment 300 includes: a receiving unit 301, a computing unit 302, and a scheduling unit 303, wherein:

[0069] The receiving unit 301 is configured to receive the input distribution network fault point set and input it into the calculation unit;

[0070] The calculation unit 302 is configured to calculate and obtain the optimal feasible solution of resource scheduling according to the resource scheduling model after obtaining the distribution network fault point set;

[0071] The scheduling unit 303 is configured to schedule fault repair resources according ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the application discloses a power distribution network fault repairing resource scheduling method. The method comprises: receiving an inputted power distribution network fault point set as the input of a resource scheduling model; conducting calculating to obtain a resource scheduling optimal feasible solution based on the repairing resource scheduling model, wherein the resource repairing model is a fault repairing time function considering fault emergency degree; and scheduling the fault repairing resources according to the input of the resource scheduling model. The embodiment of the application further discloses a power distribution network fault repairing resource scheduling apparatus. With the method and the apparatus of the embodiment of the application, the scheduling efficiency and the resource utilization rate of the fault repairing resource scheduling are improved.

Description

technical field [0001] The present application relates to the technical field of power systems, and in particular to a resource scheduling method and corresponding device for distribution network fault repair. Background technique [0002] The power system is a huge network system of power production and consumption composed of power generation, power transmission, power transformation, power distribution and power consumption. In this system, the distribution network plays the role of distributing power to distribution stations or various power loads. important role. The distribution network includes overhead lines, cables, towers, distribution transformers, isolating switches, reactive power compensation capacitors, and some ancillary facilities. These distribution network power equipment will have power failures due to various reasons during operation. To ensure For the normal operation of the distribution network, it is necessary to repair the equipment that has a power...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 俞振华熊丽娟谭勇桂付文岗冯海燕许泰峰谷然
Owner NARI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products