A technology of corrugated steel plates and installation methods, which is applied in the field of corrugated steel plates for corrugated steel plate arch bridges and culverts and the installation of bridges and culverts. The overall mechanical performance is reasonable and the effect of meeting the assembly accuracy requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0061] A corrugated steel sheet for corrugated steel arch bridges and culverts, such as figure 1 As shown, the corrugated steel sheet used for the corrugated steel arch bridge and culvert comprises a corrugated steel sheet main body 1 and two end steel connecting plates 2-1 and 2-2.
[0062] The two end steel connecting plates 2-1 and 2-2 are rectangular steel plates with the same shape and size, and the width of the rectangle is larger than the wave height of the corrugated steel plate The row has n through holes in total.
[0063] A piece of end steel connecting plate is vertically welded to the middle of the two broad sides of the corrugated steel sheet main body 1. The width l of the corrugated steel sheet main body 1 is 2 Grow the length l of the steel connecting plate at the end 3 The two ends of each half wavelength l 4 .
[0064] A method for installing bridges and culverts using corrugated steel sheet for corrugated steel arch bridges and culverts, the installatio...
Embodiment approach 2
[0102] In engineering cases, l 0 = 15m, L = 6m, l 1 = 2m, l 2 =1.7m, l 3 =1.5m, l 4 =0.1m.
[0103] Step 1: Calculate the number of rows N of corrugated steel sheet used for corrugated steel arch bridges and culverts used in the construction of corrugated steel arch bridges and culverts:
[0104] N=15 / 2=7.5m
[0105] Calculate the number M of corrugated steel sheets for each row of corrugated steel arch bridges and culverts:
[0106] M=6 / 1.5=4m
[0107] In step 2, the long-side cutting method of the two first rows of corrugated steel plate sheets directly connected to the first and second arch platforms D-1 and D-2 for corrugated steel plate arch bridges and culverts is as follows:
[0108] The fractional part n of N resulting from the calculation 0 < 0.6, the corrugated steel sheet used for the corrugated steel arch bridge and culvert is cut to 1.5m along the direction perpendicular to the long side;
[0109] The cutting method of the wide side of the corrugated stee...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com