Method, equipment and system for scheduling transmission circuit resources
A transmission system and transmission resource technology, applied in the field of equipment and system, transmission circuit resource scheduling method, can solve problems such as no effective allocation method and no solution given, so as to avoid local full resistance and improve efficiency , high safety effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] According to an embodiment of the present invention, a method for scheduling transmission circuit resources is provided, figure 1 It is a flow chart of Embodiment 1 of the method for scheduling transmission circuit resources according to the present invention, as shown in figure 1 As shown, this embodiment includes:
[0046]Step S102: According to the location information of both ends of the service equipment to be dispatched, determine the start and end station information of the circuit to be dispatched;
[0047] Step S104: Searching for idle channel resources of each transmission system passing through the start and end stations from the hierarchically stored transmission resource information according to the start and stop station information;
[0048] Step S106: According to the free channel resources and the number of circuits to be scheduled, at least two transmission systems are selected for hierarchical scheduling of the number of circuits to be scheduled.
...
Embodiment 2
[0051] figure 2 It is a flow chart of Embodiment 2 of the method for scheduling transmission circuit resources according to the present invention. This embodiment is a specific and detailed schematic diagram of the scheduling process of the present invention, as shown in figure 2 As shown, this embodiment includes:
[0052] Step S200: Establish a vertical hierarchical structure for transmission resources and a horizontal hierarchical structure corresponding to the vertical hierarchical structure. Specifically, the vertical and corresponding horizontal hierarchical structures can be found in image 3 with Figure 4 ;
[0053] The vertical hierarchical structure can solidify the information of the middle point of the resource, such as image 3 As shown, the vertical hierarchical structure can be roughly divided into provinces, cities, sites, computer rooms, equipment, disks, and ports. Other content is set within the hierarchy.
[0054] The horizontal layered structure is...
Embodiment 3
[0071] In the above-mentioned embodiments, since the security of the bearer system is considered when resource allocation is performed, at least two transmission systems can be selected for hierarchical scheduling. Specifically, Figure 8 The load sharing method shown in the embodiment.
[0072] For the convenience of the following description, some parameters are described, assuming that the actual allocation of 10 circuits from site A to site Z is required, which is referred to as the A office route-Z office route (abbreviated as A-Z) hereinafter. The method of load sharing, dispatching and distribution is mainly to find out the bearer numbers of the opened circuits of the original A / Z office route in different transmission systems and The idle channel of the existing transmission system calculates the allocation ratio each time, completes the resource allocation, and finally achieves that multiple circuits in the same bureau run at a ratio of 1:1 on two systems and two sets...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com