Tunnel information tracing accurate grouting method
A grouting and precise technology, applied in tunnels, tunnel linings, earth-moving drilling, etc., can solve the problems of thick reinforcement ring, long construction period, and large number of drilling holes, so as to reduce impact, high grouting effect, and reduce grouting. The effect of the amount of pulp
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] List the following engineering examples to further illustrate the grouting method of the present invention
[0035] 1. Project introduction. The total length of the Qiyueshan Tunnel is 10,528 meters, the maximum buried depth is 670 meters, and the height difference between the entrance and exit reaches 150 meters. The tunnel passes through the Qiyueshan anticline structure, passes through 15 faults, and 3 underground rivers. With an area of 743,000 square meters, the Qiyueshan Tunnel is a typical representative of mountainous railway tunnels in the current domestic railway construction. The risk and difficulty of karst development, high-pressure water inrush and mud inrush are rare in China, and it is praised as world-class by domestic tunnel experts and peers. The tunnel is mainly characterized by poor geological conditions and high engineering risks. Whether it can be safely and smoothly penetrated controls the construction safety and construction period of the entir...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com