Scheduling method of grid resources of multi-Qos
A grid resource and scheduling method technology, applied in the field of multi-QoS grid resource scheduling, can solve the problems of taking time and overhead requirements into account, and not taking user needs into account, and achieve the effect of achieving satisfaction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0090] Assuming that a grid user has 8 tasks to execute, the lengths are 8000, 7000, 6000, 5000, 4000, 3000, 2000, 1000, the unit is MI, the Deadline and Budget set by the user are both 1000, and the system has 3 at this time. Available resources R 1 , R 2 , R 3 , The execution speed is 300MIPS, 500MIPS, 800MIPS, and the overhead is 3.0, 5.0, 8.0 (unit cents / sec).
[0091] When the time weight timeWeight=1 and the cost weight costWeight=0, the scheduling process is shown in the following table:
[0092] Task
ID
Task chief
Degree
start execution
Moment
Finished
Moment
Overhead
(cents)
Available resources
0
8000
19.32
77.32
80.0
Resourse_0
1
7000
24.76
81.51
43.75
Resourse_1
2
6000
30.2
85.7
22.5
Resourse_2
3
5000
77.32
131.57
50.0
Resourse_0
4
4000
81.51
134.51
2...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com