An energy management system and parameter estimation technology, which is applied in the field of estimation of power system reactance parameters, can solve problems such as accurate identification of wrong parameters, inability to realize full parameter estimation, difficulties, etc.

Active Publication Date: 2009-08-12
STATE GRID CORP OF CHINA +3
View PDF0 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

These parameter estimation methods all assume that there are only a small number of parameter errors in the power grid. It is necessary to perform parameter identification first, find the position of the wrong parameters in the power grid, and then perform parameter estimation. The original parameters of the power grid need to be used in the parameter estimation process, and full parameter estimation cannot be realized.
In fact, it is very difficult to accurately identify wrong parameters when the full parameter estimation cannot be performed. In addition, the use of original parameters in the parameter estimation process is likely to cause errors in the estimation results.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electricity transmission network reactor parameter estimation method in scheduling energy management system
  • Electricity transmission network reactor parameter estimation method in scheduling energy management system
  • Electricity transmission network reactor parameter estimation method in scheduling energy management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0060] The specific implementation method of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0061] 1. Give the specific loop measurement equation, branch measurement equation and overall estimation model used in the calculation of the implementation example

[0062] The formula (1) given in the summary of the invention, formula (2) and formula (3) are physical equations used for theoretical introduction, and the loop measurement equations used in the specific application of the implementation example will be given below, Branch measurement equations and estimation models.

[0063] 1. Loop Measurement Equations

[0064] Formula 1)

[0065] In the formula: the left term is the measurement error component, and the superscripts in it represent different grid sections, assuming that a total of n grid sections are selected. Subscripts represent different circle bases, assuming that there are m circle base...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a method for evaluating a reactance parameter of a transmission network in an energy dispatching management system. The method comprises the following steps: 1, acquiring an information output section of SCADA at a certain moment to start the evaluation of the reactance parameter of the transmission network in the energy dispatching management system; 2, carrying out pre-identification processing on remote sensing and remote signaling after a new section of information output of the SCADA system is acquired, and determining the data accuracy of the acquired section logically; 3, topologically searching according to the state of a disconnecting link of a power grid switch in each section of the SCADA system to generate each independent circuit and cycle basis group; 4, writing a loop measurement equation corresponding to each cycle basis, making each cycle basis group correspond to a group of loop measurement equations; and 5, adding the loop measurement equation corresponding to the cycle basis into the loop measurement equation group corresponding to the same cycle basis group if the rank is increased; switching to 1 if the cycle basis group which is not solved still exists; and continuing to acquire a new section of the SCADA until branch reactance parameters of all the cycle basis groups are evaluated and solved.

Description

technical field [0001] The invention relates to a method for estimating and releasing reactance parameters of a power system, which is suitable for completely estimating all series reactance parameters in a power transmission network in a dispatching energy management system. Background technique [0002] All kinds of advanced application software in dispatching energy management system, such as state estimation, dispatcher power flow, static security analysis, dynamic security analysis, optimal power flow, etc., all require that the given grid parameters are basically correct. The parameters of power grid equipment are basically given separately by typical values ​​or measured values ​​before the equipment is powered on. Due to the large number of power transmission equipment in the power grid, the huge time span for inputting equipment modeling parameters, the conversion of per unit value and famous value, and equipment database management, etc., there will always be more ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00G06F17/50
CPCY02E60/76Y04S40/22Y02E60/00
Inventor 何桦
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products