Method for connecting and installing unit curtain walls
An installation method and unit curtain wall technology, applied to walls, building components, buildings, etc., can solve the problem that the installation sequence on the construction site is difficult to meet the requirements of the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0016] The entire curtain wall implementation method is as follows:
[0017] First, if Figure 1 to Figure 3 As shown, the floor unit panels Q have been installed on two adjacent floors, and the adjustment and positioning functions of the supports 31 and 32 have been fully utilized to confirm that the supports are well connected and the unit panels Q are in place accurately.
[0018] Place the core sleeve 12 and the core sleeve 13 at the upper beam 11 of the floor unit plate Q with its horizontal division as the center, and fill the sealant 61 between the core sleeve 12 and the core sleeve 13 and the cross beam 11; Pass through the lower beam 14 of the floor unit plate Q, place the core sleeve 15 and the core sleeve 16 with its horizontal division as the center, and fill the sealant 62 between the core sleeve 15 and the core sleeve 16 and the cross beam 14. Among them, the installation of unit Q can be done indoors or outdoors.
[0019] Then, install the interstory unit plat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com