Multi-time-scale optimization scheduling method considering flexible load and ESS-SOP
A multi-time-scale, flexible load technology, applied to load forecasting in AC networks, selective AC load connection devices, climate sustainability, etc. To achieve good economic benefits, suppress voltage fluctuations and load fluctuations, and improve effectiveness and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0115] The present invention will be further described below in conjunction with the accompanying drawings.
[0116] refer to Figure 1 to Figure 5 , a multi-time-scale optimal scheduling method considering flexible load and ESS-SOP, including the following steps:
[0117] S1: Construct the flexible load and ESS-SOP model of the system, divide the flexible load into translational, transferable and cutable loads, and initialize the system to obtain original data;
[0118] S2: In the day-ahead stage, quantitatively analyze the dynamic process of various flexible loads and ESS-SOP collaborative scheduling, and obtain the flexible load change period and ESS-SOP output plan;
[0119] S3: Enter intraday optimization with a cycle of 24 hours and an optimization step of 0.5 hours. The shiftable load and transferable load decision-making amount obtained from step S2 is regarded as the reference value, and coordinated and optimized with other controllable resources to obtain the optimal ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com