Transformer substation high-voltage bus two-stage voltage reduction power taking method and station power wiring structure

A high-voltage busbar and substation technology, applied in the field of power transmission and transformation, can solve the problems of small operation and maintenance workload, inconvenient power supply outside the station, etc., achieve small operation and maintenance workload, significant engineering practical application value, and control early equipment investment Effect

Pending Publication Date: 2021-04-27
NORTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to solve the problem of the inconvenient power supply outside the substation of the new substation in the remote area in the above-mentioned prior art, to provide a substation high-voltage bus two-stage step-down power supply method and a substation power connection structure, through the high-voltage bus through two Step-down to meet the demand of the load in the station, can effectively control the initial equipment investment, and the later operation and maintenance workload is small

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transformer substation high-voltage bus two-stage voltage reduction power taking method and station power wiring structure
  • Transformer substation high-voltage bus two-stage voltage reduction power taking method and station power wiring structure
  • Transformer substation high-voltage bus two-stage voltage reduction power taking method and station power wiring structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The meanings of the letter marks in the drawings are as follows: BSG-outlet bushing; VD-three-phase live display device; DS-isolating switch; ES-earth switch; CT-current transformer; CB-circuit breaker; SA-lightning arrester; LRCT - Bushing current transformer; 330TR-330kV station high-voltage on-load tap-changing transformer; TC-cable terminal; PT-voltage transformer; 10TR-10kV station low-voltage work transformer; FU-fuse; LCT-zero-sequence current transformer Device; ATS-dual power automatic transfer switch.

[0020] Aiming at the demand for taking power out of the new substation in remote areas, the invention introduces the idea of ​​taking power from the high-voltage busbar, realizes it through two-stage voltage reduction, effectively controls the initial investment of the project, and the operation and maintenance workload in the later substation is also very small.

[0021] see figure 1 In the present invention, the two-stage step-down of the high-voltage bus in...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

According to the substation high-voltage bus two-stage step-down power taking method and the substation electric wiring structure, a 330kV bus takes power and is connected with the 330kV bus through an HGIS circuit breaker, the first stage is changed into 10kV through a step-down transformer with the transformation ratio of 330 / 10kV, a lightning arrester is added to the 330kV side of the 330 / 10kV step-down transformer to achieve 330kV side overvoltage protection; and the second stage is changed into 0.38 kV through a step-down transformer with the transformation ratio of 10 / 0.38 kV, and a voltage transformer is additionally arranged on the 10kV side of the step-down transformer with the transformation ratio of 10 / 0.38 kV, so that voltage measurement is realized. According to the invention, the early investment of the project is saved, the construction and the installation are convenient, the installation, the maintenance and the operation are more convenient, safer and more reliable, and the method can be effectively applied to the actual project.

Description

technical field [0001] The invention belongs to the field of power transmission and transformation, and relates to a two-stage step-down step-down power-taking method of a high-voltage bus bar in a substation and a substation power connection structure. Background technique [0002] With the rapid development of power grid construction, the coverage of power grid construction is getting wider and wider. In order to strengthen the grid structure, more and more new substations were built in remote areas that were rarely covered in the past. few, and the distribution is sparse, there is often a difficult situation where there is no off-station power source within hundreds of kilometers of the newly-built site. If long-distance transmission is adopted, the overall demand power of the station load is very small, resulting in high transmission costs, large losses, and a large amount of line maintenance in the later period, which is very uneconomical; if new energy photovoltaics ar...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00H02B1/20H02J11/00
CPCH02J3/00
Inventor 陈奇康旭伟刘小刚康鹏杨帆张丽雯
Owner NORTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products