A prefabricated wall panel with an integrated green building extending to form a corner panel and its use method

A green building and prefabricated technology, which is applied in the processing of building materials, construction, building components, etc., can solve the problems of high transportation costs and high structural strength, and achieve the effects of low transportation requirements, improved structural strength, and increased joint strength

Active Publication Date: 2022-01-11
HUACHUANG ARCHITECTURAL DESIGN CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In view of the related technologies mentioned above, the inventor believes that the complete production of each structure of the building and then transportation will have a relatively high transportation cost. At the same time, after assembly, the position of each node needs to be poured again, and Its structural strength will not be as high as that of a one-piece poured building

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A prefabricated wall panel with an integrated green building extending to form a corner panel and its use method
  • A prefabricated wall panel with an integrated green building extending to form a corner panel and its use method
  • A prefabricated wall panel with an integrated green building extending to form a corner panel and its use method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0045] Embodiment 1: A kind of prefabricated wall panel with an extension to form a corner panel for green building integration, refer to figure 1 , which includes an inner wall panel 101 and an outer wall panel 102, a pouring gap 103 is left between the inner wall panel 101 and the outer wall panel 102, and a reinforcement mesh 104 is placed in the pouring gap 103, wherein the inner wall panel 101 and the outer wall panel 102 The outer wall panels 102 are light and thin prefabricated panels, which are directly used as templates to form a pouring space for pouring and molding. A fixing component 200 is arranged between the inner wall panel 101 and the outer wall panel 102 , and the reinforcement mesh 104 is fixed to the fixing component 200 . After the inner wall panel 101, the outer wall panel 102, and the reinforcement mesh 104 are fixed, concrete is filled into the pouring gap 103, and after curing, a complete structure is formed.

[0046] like figure 1 and figure 2 As ...

Embodiment 2

[0053] A prefabricated wall panel with an integrated green building extending to form a corner panel. Its structure is generally the same as that of Embodiment 1, except that the wall 100 connects the component 400 between the walls 100 . In actual use, there are various connection structures between the wall body 100 and the wall body 100 , including horizontal butt joint and certain angle butt joint. At this time, the square pipe connection mechanism of the joint member 420 can be replaced. In conjunction with the accompanying drawings of Embodiment 1, and with reference to Figure 4 and Figure 5 , Image 6 It is a schematic diagram of a horizontal docking structure. The docking piece 420 includes a first docking plate 422 and a second docking plate 423. The first docking plate 422 and the second docking plate 423 are integrated. Connecting holes 421 are respectively provided, and the connecting hooks 411 are fastened through the connecting holes 421 . The first butt pla...

Embodiment 3

[0055] A prefabricated wall panel with an integrated green building extending to form a corner panel. Its structure is generally the same as that of Embodiment 1, the difference lies in the installation of the insulation board 300 when the wall 100 is docked with the wall 100 . In conjunction with the accompanying drawings of Embodiment 1, and with reference to Figure 7 , in the process of horizontal docking, its structure does not change, which mainly lies in the structural adjustment of the docking position of the wall 100 at the corner position. A corner post 260 is set at the corner of the wall body 100 and the wall body 100. The corner post 260 has the same structure as the hollow post 210. The corner post 260 is also provided with a fixing head 240 for piercing the steel bar 107, and the corner post 260 The connecting groove 220 is also arranged on the top, and the corner column 260 can be set as a hollow tube. The connecting groove 220 on the corner column 260 correspo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The application relates to a prefabricated wall panel with extended corner panels for green building integration and a method of use, including an inner wall panel and an outer wall panel. There is a pouring gap between the inner wall panel and the outer wall panel, and the inner wall panel It forms a wall with the outer wall panels, and a reinforcing rib net is arranged in the pouring gap, a fixing component is arranged between the inner wall panel and the outer wall panel, and a connecting component is arranged between the wall and the wall, and the connecting component includes the inner wall The connecting plate on the panel or the inner wall panel and the butt joint used to connect the adjacent inner wall panel or the adjacent outer wall panel, and the butt joint is fastened to the connecting plate. The present application has the effect of increasing the structural strength between the wall panels and reducing the cost of prefabricated element transportation.

Description

technical field [0001] The present application relates to the field of building construction, in particular to a prefabricated wall panel with an integrated green building extending to form a corner panel and a method of use thereof. Background technique [0002] At present, the construction industry is an important industry for the development of people's livelihood in China, and the rapid construction of buildings has become more important. Therefore, the existing prefabricated buildings develop relatively rapidly, which prefabricates the required building structures in factories, and then passes It is transported to the site for assembly, and finally the assembled building is decorated to complete the construction of the entire building. [0003] In view of the related technologies mentioned above, the inventor believes that the complete production of each structure of the building and then transportation will have a relatively high transportation cost. At the same time, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E04B2/86E04G21/00
CPCE04B2/86E04B2/8635E04G21/00
Inventor 马永亮李二鹤韩银霞韩彩霞
Owner HUACHUANG ARCHITECTURAL DESIGN CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products