Scheduling method and device, computer device and storage medium

A computer device and team technology, applied in the computer field, can solve the problems that it can only be applied to the current scheduling time period, and cannot meet the real-time and effectiveness requirements of the scheduling plan.

Active Publication Date: 2019-05-31
CHINA PING AN LIFE INSURANCE CO LTD
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In most general enterprises, managers or special schedulers carry out manual scheduling. However, each scheduling result can only be applied to the current scheduling time period (such as the current quarter), which makes manual scheduling unable to meet the requirements of scheduling. Plan to adapt to real-time and effective needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Scheduling method and device, computer device and storage medium
  • Scheduling method and device, computer device and storage medium
  • Scheduling method and device, computer device and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] See figure 1 What is shown is a flowchart of the shift scheduling method provided by the first embodiment of the present invention, and the shift scheduling method is applied to a computer device. According to different needs, the order of the steps in the flowchart can be changed, and some steps can be omitted.

[0032] In step S11, an initial shift list of at least one shift group is retrieved, the initial shift list includes a plurality of on-duty candidate options included in the shift group, each on-duty candidate option has a continuous working time, the The on-duty candidate options in the initial shift list are automatically cycled for multiple rounds in an initial shift period according to an initial shift sequence.

[0033] Wherein, the computer device stores multiple shift groups and multiple shift candidate lists, and multiple shift groups correspond to multiple initial shift lists one-to-one, and the correspondence between the shift groups and the initial shift ...

Embodiment 2

[0061] figure 2 It is a structural diagram of a preferred embodiment of the scheduling device 10 of the present invention.

[0062] In some embodiments, the shift scheduling device 10 runs in a computer device. The shift scheduling device 10 may include multiple functional modules composed of program code segments. The program code of each program segment in the shift scheduling device 10 may be stored in the memory of the computer device and executed by the at least one processor to realize the shift scheduling function.

[0063] In this embodiment, the shift scheduling device 10 can be divided into multiple functional modules according to the functions it performs. See figure 2 As shown, the functional modules may include: an invocation module 101, a determination module 102, a first adjustment module 103, a second adjustment module 104, and a notification module 105. The module referred to in the present invention refers to a series of computer program segments that can be e...

Embodiment 3

[0083] image 3 It is a schematic diagram of a preferred embodiment of the computer device of the present invention.

[0084] The computer device 1 includes a memory 20, a processor 30, and a computer program 40 stored in the memory 20 and running on the processor 30, such as a shift program. When the processor 30 executes the computer program 40, the steps in the above scheduling method embodiment are implemented, for example figure 1 Steps S11 to S16 shown. Or, when the processor 30 executes the computer program 40, the functions of the modules / units in the above-mentioned shift scheduling device embodiment are realized, for example figure 2 Units 101-105 in.

[0085] Exemplarily, the computer program 40 may be divided into one or more modules / units, and the one or more modules / units are stored in the memory 20 and executed by the processor 30 to complete this invention. The one or more modules / units may be a series of computer program instruction segments capable of completi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The scheduling method comprises the following steps: calling an initial scheduling list, and carrying out multi-round automatic circulation on duty candidate options in the initial scheduling list inan initial scheduling time period according to an initial scheduling sequence; Determining a target scheduling time period; Adjusting the initial scheduling list according to the target scheduling time period to obtain a middle scheduling list, and enabling the on-duty candidate options to perform multi-round automatic circulation in the target scheduling time period according to the initial scheduling sequence; Calculating the total working duration of each on-duty candidate option, and calculating a fairness value according to a preset scoring standard; When the fairness value is less than an initial adaptive value, adjusting the initial duty order of at least one duty candidate option until the fairness value is greater than or equal to the initial adaptive value, thereby obtaining a target scheduling list; And informing an on-duty candidate option. According to the embodiment of the invention, automatic adjustment can be carried out according to the target scheduling time period, and the scheduling result is automatically notified, so that data visualization is realized.

Description

Technical field [0001] The present invention relates to the field of computer technology, in particular to a scheduling method, a scheduling device, a computer device and a computer-readable storage medium. Background technique [0002] Shift scheduling is an important means of rationally arranging work manpower and is widely used in all enterprises. Shift scheduling is mainly based on the actual business development needs of the company, and reasonable arrangements for manpower to work in various time periods to ensure that the company’s business needs are met without causing waste of human resources. In general enterprises, management personnel or special schedulers perform manual scheduling. However, each scheduling result can only be applied to the current scheduling time period (such as the current quarter), making manual scheduling unable to meet the scheduling requirements Plan the need for real-time and effectiveness. Summary of the invention [0003] In view of the abov...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10
Inventor 王小龙
Owner CHINA PING AN LIFE INSURANCE CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products