Scheduling method and device, computer device and storage medium
A computer device and team technology, applied in the computer field, can solve the problems that it can only be applied to the current scheduling time period, and cannot meet the real-time and effectiveness requirements of the scheduling plan.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] See figure 1 What is shown is a flowchart of the shift scheduling method provided by the first embodiment of the present invention, and the shift scheduling method is applied to a computer device. According to different needs, the order of the steps in the flowchart can be changed, and some steps can be omitted.
[0032] In step S11, an initial shift list of at least one shift group is retrieved, the initial shift list includes a plurality of on-duty candidate options included in the shift group, each on-duty candidate option has a continuous working time, the The on-duty candidate options in the initial shift list are automatically cycled for multiple rounds in an initial shift period according to an initial shift sequence.
[0033] Wherein, the computer device stores multiple shift groups and multiple shift candidate lists, and multiple shift groups correspond to multiple initial shift lists one-to-one, and the correspondence between the shift groups and the initial shift ...
Embodiment 2
[0061] figure 2 It is a structural diagram of a preferred embodiment of the scheduling device 10 of the present invention.
[0062] In some embodiments, the shift scheduling device 10 runs in a computer device. The shift scheduling device 10 may include multiple functional modules composed of program code segments. The program code of each program segment in the shift scheduling device 10 may be stored in the memory of the computer device and executed by the at least one processor to realize the shift scheduling function.
[0063] In this embodiment, the shift scheduling device 10 can be divided into multiple functional modules according to the functions it performs. See figure 2 As shown, the functional modules may include: an invocation module 101, a determination module 102, a first adjustment module 103, a second adjustment module 104, and a notification module 105. The module referred to in the present invention refers to a series of computer program segments that can be e...
Embodiment 3
[0083] image 3 It is a schematic diagram of a preferred embodiment of the computer device of the present invention.
[0084] The computer device 1 includes a memory 20, a processor 30, and a computer program 40 stored in the memory 20 and running on the processor 30, such as a shift program. When the processor 30 executes the computer program 40, the steps in the above scheduling method embodiment are implemented, for example figure 1 Steps S11 to S16 shown. Or, when the processor 30 executes the computer program 40, the functions of the modules / units in the above-mentioned shift scheduling device embodiment are realized, for example figure 2 Units 101-105 in.
[0085] Exemplarily, the computer program 40 may be divided into one or more modules / units, and the one or more modules / units are stored in the memory 20 and executed by the processor 30 to complete this invention. The one or more modules / units may be a series of computer program instruction segments capable of completi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com