Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and construction method

A technology of steel mesh and trackless trolley, which is applied in the direction of dams, barrages, weirs, etc., can solve the problems of high cost of installation and removal of tracks, time-consuming and labor-intensive adjustment of trolley height, and sloshing of mesh, so as to achieve simple and fast construction , Easy to install and remove, easy to transfer

Active Publication Date: 2018-11-23
CHINA GEZHOUBA (GRP) FIRST ENG CO LTD +1
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a trackless trolley and construction method for transporting the steel mesh of the face of the rockfill dam, which can overcome the need to lay the track in the prior art, and when the height difference between the first pouring block and the subsequent pouring block is involved, The height adjustment of the trolley is time-consuming and laborious. Technical problems such as mesh sloshing, easy derailment, high cost of installing and removing the track during walking

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and construction method
  • Trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and construction method
  • Trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] Such as Figure 1~9 Among them, there is a trackless trolley for transferring steel mesh panels of rockfill dam panels. A plurality of walking tire devices 5 are provided at the bottom of the trolley frame, and the walking tire devices 5 are connected to the trolley frame through a lifting mechanism;

[0042] A plurality of liftable hooks 9 are also provided at the bottom of the trolley frame. With this structure, the trackless trolley of the present invention can individually adjust the height of the walking tire device 5 and the height of the suspended steel mesh according to the different working conditions of various panel thicknesses in the construction of the panel first and second blocks. To overcome the problems in the prior art.

[0043] In a preferred solution, the lifting mechanism is a screw jack, one end of the screw jack is fixedly connected to the shaft of the walking tire device 5, and the other end of the screw jack is fixedly connected to the trolley frame...

Embodiment 2

[0054] A construction method of a trackless trolley that uses the above-mentioned transfer of steel mesh panels of the rockfill dam faceplate includes the following steps:

[0055] s1. First hoist the first steel truss 1 to the dam surface, adjust the construction direction and fix the position, and then hoist the second steel truss 1'to the dam surface. After adjusting the construction direction, use the hinge pins 13 to connect to each other, and then use The connecting steel member 15 is fixedly connected. The two sides of the trolley frame are connected with the hoist wire rope 14 of the hoist on the top of the dam; the walking tire device 5 is located outside the joint 10 of the current cast block.

[0056] s2. When the walking tire device 5 of the trackless trolley transfers the steel mesh on the post-cast block 12, lift the trolley frame. In the preferred solution, the hydraulic jack in the liftable hook 9 is used to lift the trolley against the ground Or use a car crane to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and a construction method. A plurality of walking tire devices are arranged at the bottom ofa trolley frame, and the walking tire devices are connected with the trolley frame through a lifting mechanism. A plurality of liftable hooks are further arranged at the bottom of the trolley frame.The construction method comprises the following steps that when the walking tire devices of the trackless trolley transfers the reinforcing mesh sheets on post-poured blocks, through the cooperation of the lifting mechanism and the liftable hooks, the height of the trolley can be adjusted to adapt to a construction site, the liftable hooks hangs the reinforcing mesh sheets, the reinforcing mesh sheets are transported to setting positions by using the trolley, when the arrangement of the reinforcing mesh sheets of a current row is finished, the trackless trolley is moved to another row, and theabove steps are continued; and the transferring of the reinforcing mesh sheets can be realized by above steps. The liftable walking tire devices are arranged, the trackless trolley can be adapted tothe quick hanging and mounting, transferring and quick in-place installation construction of the reinforcing mesh sheets when the panel thickness is varied during the construction of first-poured blocks and the post-poured blocks of the panels.

Description

Technical field [0001] The invention relates to the construction field of face rockfill dams of water conservancy and hydropower, in particular to a trackless trolley for transferring steel mesh of face plates of rockfill dams and a construction method. Background technique [0002] At present, in the 30 years since the concrete face rockfill dam entered China, the construction and installation technology of the face slab reinforcement has been initially developed. The most commonly used method of steel reinforcement production and installation is to use a small steel reinforcement material transport vehicle, which is transported to the binding position by a hoist, and then manually Root handling and binding; another few projects use prefabricated steel mesh, and then use the steel mesh transport trolley to transport the mesh to the installation site. The former method transports bulk steel bars on the slope surface, and the manual transfer installation method on the slope surfac...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02B7/06
CPCE02B7/06
Inventor 黄静刘怀亮张晓瑞雷骊彪杨谦裴佩伍赛肖双红胡方华刘世艳
Owner CHINA GEZHOUBA (GRP) FIRST ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products