Method of Pre-splitting Roof of Multi-point Dispersed Parallel Blasthole in Fully Mechanized Mining Face
A technology for fully mechanized mining face and working face, which is applied in drilling equipment and methods, earthwork drilling, drilling with explosives, etc. The effect of impact range, reduction of suspended ceiling area, and reduction of sticking phenomenon
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be further described below in conjunction with the accompanying drawings.
[0024] as attached figure 1 to attach image 3 As shown, the method for multi-point scattered parallel blasthole pre-splitting roof in fully mechanized mining face includes the following steps:
[0025] Step 1: Determine the drilling rig support angle according to the maximum and minimum mining height of the bracket installed in the cutting hole, and determine the blasthole final hole depth, angle, blasthole spacing and number of blastholes according to the roof lithology;
[0026] Step 2: Drilling blastholes in the cutting hole of the coal mining face, the distance between the blastholes is set between the mining side coal wall and the coal wall of the working face, and the blastholes are inclined to the roof of the working face and parallel to the working face. Blast holes are evenly drilled at equal intervals along the cutting direction of the working face;
[00...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com