Cluster resource scheduling method and system
A resource scheduling and resource technology, applied in the transmission system, electrical components, etc., can solve the problems of low resource utilization, large investment, unused realization, etc., and achieve the effect of improving allocation efficiency, improving utilization rate, and flexible resource allocation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0021] figure 1 It is a flowchart of a cluster resource scheduling method provided by an embodiment of the present invention. Such as figure 1 As shown, this embodiment provides a cluster resource scheduling method, and the specific steps of the method are as follows:
[0022] S101. The cluster resource scheduling system receives a resource request based on a preset resource policy sent by a tenant administrator user.
[0023] In this embodiment, resources ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com