Metro-adjacent complex geological environment supporting system construction method
A technology with complex geology and construction methods, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as damage to the vibration of track test lines, and achieve the effects of solving mud pollution, improving bearing capacity, and flexible walking of equipment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] (1) Determine the positions of the foundation pits of the basement 1 of the 1# plot and the basement 2 of the 2# plot on the front and rear sides of the track 3 of the subway test line; 6 constructions of bored piles, and the construction of the adjacent long spiral bored piles is carried out after pouring the concrete for 24 hours; the construction of the long spiral bored piles in the basement 1 of the 1# plot and the basement 2 of the 2# plot The direction is: the first step: carry out the construction of long helical bored cast-in-situ piles 6 on the side where the basement of the 1# plot 1 and the basement of the 2# plot are closest to the track 3 of the subway test line. The starting position of the construction of the cast-in-place pile 6 is the place where the soil squeezing effect is the largest; the second step: carry out the construction of the long spiral bored cast-in-place pile 6 in the remaining parts of the basement 1 of the 1# plot and the basement 2 of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com