Campus underground sap engineering situation teaching area implementation method
An implementation method and technology of teaching area, applied in the field of geology teaching, which can solve the problems of time and place being unified and simultaneous.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0026] The application principle of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0027] refer to figure 1 with figure 2 :
[0028] A method for implementing the shallow well engineering scene teaching area in the school includes:
[0029] S101. Positioning: according to the layout plan and tunnel design drawings, use white paint to position the construction area;
[0030] S102, laying the foundation: excavate the foundation at the position where the line is drawn, and dig to a depth of 30cm;
[0031] S103. Make walls: fill the excavated...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com