Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network

A distribution network planning and sorting method technology, applied in the direction of instruments, data processing applications, forecasting, etc., can solve the problems of distribution network planning projects such as small, numerous, difficult evaluation and analysis, objective and fair, etc., to achieve planning investment benefits, realize maximized effect

Inactive Publication Date: 2015-12-30
STATE GRID FUJIAN ELECTRIC POWER CO LTD +2
View PDF2 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, in distribution network planning, the optimal order of projects is mostly based on the initial investment cost of the planning scheme, and the projects with low cost are preferred; or the project effectiveness is judged subjectively based on the experience of planners, and the order of projects is determined, resulting in the optimal order of planned projects. Lack of quantitative analysis basis for investment benefits, which is greatly affected by the experience level of planners
Some scholars have proposed to establish an index system to evaluate planning projects in their research, and compare and rank them by indirectly reflecting project investment benefits. However, there are also small and numerous distribution network planning projects, and it is difficult to evaluate and analyze each project index. Both are objective and fair
In addition, because power grid enterprises, as public institutions, are also responsible for power supply obligations while pursuing economic benefits, the current project optimization and ranking lacks comprehensive consideration and measurement of enterprise power supply responsibilities and project investment benefits

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network
  • Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network
  • Planned project selecting and sequencing method comprehensively taking basic power supply responsibility of power network enterprise into consideration for low and medium voltage distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The present invention will be described in detail below in conjunction with specific embodiments and accompanying drawings.

[0039] The invention provides a method for optimizing and sorting distribution network planning projects considering the basic power supply responsibility. The method is based on the attribute of the public utility unit of the power grid enterprise, defines the project attribute for fulfilling the basic power supply obligation, and divides the project into non-participating projects based on this. There are two types of mandatory items for sorting and candidate items for sorting; and then by analyzing the benefits and cost components of the candidate items, the different types of candidate items are classified and sorted based on the ratio of benefit to cost (benefit / cost) , the one with the larger ratio is the preferred project, so as to satisfy the enterprise to maximize the investment benefits of the planned project under the premise of fulfill...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a planned project selecting and sequencing method comprehensively taking basic power supply responsibility of a power network enterprise into consideration for a low and medium voltage distribution network. The planned project selecting and sequencing method is characterized in that based on the property of public undertaking unit of the power network enterprise, defining the property of a project performing the basic power supply responsibility, and dividing the projects into two types of compulsory projects needing not to participate sequencing and to-be-selected projects needing to participate sequencing; analyzing the benefits and cost constitution of the to-be-selected projects, classifying and sequencing the to-be-selected projects of different types according to the reference of the benefit-to-cost ratio, and taking projects of which the benefit-to-cost ratio is large as preferred projects, so as to meet the maximization of project planning investment benefit of the enterprise under the premise of performing the basic power supply responsibility. The method can be effectively applied to selecting and sequencing of the low and medium voltage distribution network planned projects, so as to guide the power network enterprise to maximize the project planning investment benefit under the premise of performing the basic power supply responsibility while planning the projects.

Description

technical field [0001] The invention belongs to the technology in the field of power system distribution network planning, and in particular relates to a method for optimizing and sorting distribution network planning items. Background technique [0002] Distribution network is the last link directly facing power users. With the continuous improvement of users' requirements for power supply quality, the contradiction between their ever-increasing construction needs and the limited investment capabilities of enterprises has become increasingly prominent. Reasonable arrangement of project construction time sequence and maximization of investment benefits are urgent problems to be solved in current distribution network planning. [0003] At present, in distribution network planning, the optimal order of projects is mostly based on the initial investment cost of the planning scheme, and the projects with low cost are preferred; or the project effectiveness is judged subjectively...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
Inventor 吴桂联张林垚柯晔
Owner STATE GRID FUJIAN ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products