Secondary tension prestressed assembled corrugated steel web composite beam
A technology of corrugated steel webs and prestressed steel tendons, applied in the direction of erecting/assembling bridges, bridges, bridge parts, etc. Problems such as difficulty in replacement, to achieve the effect of improving integrity and safety, shortening the construction period, and speeding up the construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0028] The construction method of the second tensioned prestressed assembled corrugated steel web composite beam of the present invention is:
[0029] 1. Prefabricated corrugated steel web beam body:
[0030] 1) When the post-tensioning method is adopted for the primary prestressed steel beam, the prefabrication process is: tying the ordinary steel bars in the concrete top plate 1-2 and bottom plate 1-3, and using shear keys 1-4 (or other connection forms) to connect the corrugated steel web 1-1 is connected with the steel bars in the top and bottom of the concrete, and pre-embedded the primary tension prestressed tunnel and the secondary tension prestressed tunnel; erect the concrete formwork, and pour the concrete top 1-2 and concrete bottom 1-3. In the process of tying the steel bars, the horizontal and vertical connecting steel bars 1-5 and 1-6 are reserved. After the concrete strength of the top plate 1-2 and the bottom plate 1-3 meets the standard, the formwork is removed, an...
example 2
[0037] If the secondary prestressed steel strands are stretched before the beam is poured, the construction method at this time is as follows:
[0038] 1. Prefabricated corrugated steel web beam body, the specific steps are the same as construction example 1.
[0039] 2. Erection of composite beams and construction of secondary prestressed steel beams
[0040] Such as figure 2 , Figure 4 As shown, the bridge abutment or pier 4 is constructed on site, temporary supports 5 are installed, and the prefabricated beam is hoisted to the abutment or pier 4 with cranes and other equipment, and the transverse direction between two adjacent prefabricated beams is tied or welded Connect steel bars 1-5, and then pour the wet joints 2 between adjacent beams, so that the main beams form a closed box section, see image 3 ; After the concrete strength of the wet joint 2 meets the requirements, tension the secondary prestressed steel strands 1-8 in the concrete bottom plate 1-3 (from Figure 4 It c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com