Inversed construction method for adding basement in existing building
A construction method and basement technology, applied in construction, building maintenance, building construction, etc., can solve the problems of lack of foresight, undesigned underground parking lot, parking difficulty, etc., and achieve reduction of construction waste, low cost, and short construction period Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0037] The present invention will be further described below in conjunction with specific embodiments.
[0038] The invention provides a reverse construction method for adding a basement to an existing building, which includes the following sequential construction steps:
[0039] Step 1: Carry out on-site positioning and setting out according to the original building design parameters, determine the excavation earthwork slope, the well hole position of the dewatering well, the layout of the borehole pressure grouting pile, and the size of the cap; the borehole pressure grouting pile Straight piles or oblique piles with network structure can be used to arrange around the original foundation cap, and consideration should be given to avoiding the position of foundation beams and columns, and the first floor slab should be removed after the arrangement is completed;
[0040] Step 2: Construction of bored pressure grouting piles;
[0041] The construction of the bored pressure gro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com