Double-layer hollow concrete wall and construction method thereof
A double-layer hollow concrete slab technology, applied in the direction of formwork/formwork/work frame, walls, building components, etc., can solve the problems of reducing the utilization rate of construction materials, affecting the sound insulation effect of sandwich walls, and inconvenient erection of formwork, etc., to meet the requirements of Sound insulation requirements, easy disassembly, and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Example 1: Combining Figure 7 Illustrate the double-layer hollow concrete slab wall of the present invention, which is formed by connecting several sections of construction units. This embodiment takes a construction unit as an example to describe its structure and composition in detail. The above construction units include two parallel and spaced concrete slab 1; two ring beams connected between two concrete slabs 1, namely bottom ring beam 3 and top ring beam 5; two concrete slabs 1, bottom ring beam 3 and top ring beam 5 together form a closed Cavity 6'; wherein, the bottom ring beam 3 is composed of a prefabricated slab interlayer-2 connected between two concrete slabs 1 and concrete components poured on the prefabricated slab interlayer-2, and the top ring beam 5 is formed by connecting The prefabricated slab interlayer 2 4 between the two concrete slabs 1 is composed of the concrete member poured on the prefabricated slab interlayer 2 4 .
[0032] The double-lay...
Embodiment 2
[0036] Embodiment 2: Combination Figure 2 to Figure 7 Illustrate the construction method of double-layer hollow concrete slab wall of the present invention, concrete steps are as follows:
[0037] S101: if figure 2 and image 3 As shown, the formwork system 20 of two concrete slabs 1 is set up, the pre-embedded steel bars 7 are set in the formwork system 20 and concrete is poured, and after the concrete reaches the design strength, the formwork system 20 is removed to obtain the concrete slab 1;
[0038] S102: if Figure 4 As shown, a prefabricated slab interlayer 1 is horizontally set between the two concrete slabs 1 prepared in step S101, specifically, the prefabricated slab interlayer 1 is fixed to the pre-embedded steel bars protruding from the top of the concrete slab 1 7, and make the prefabricated slab interlayer one 2 able to cover the cavity 6 between the two concrete slabs 1;
[0039] S103: if Image 6 As shown, the prefabricated slab interlayer 12 is used as ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com