Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

New construction and reconstruction planning cooperative optimization method for main equipment in power distribution network

A technology for collaborative optimization and distribution network, applied in the fields of instruments, data processing applications, forecasting, etc., can solve problems such as the inability to realize the optimization and coordination of distribution network project reconstruction and start-up and new construction and put into production sequence, prone to errors, and many iterations.

Active Publication Date: 2015-01-14
STATE GRID CORP OF CHINA +1
View PDF3 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, a single application of cluster analysis technology or collaborative optimization method cannot realize the optimal coordination arrangement for the start-up and new commissioning of distribution network projects in any region.
The main reason is that the existing cluster analysis technology does not have clustering calculation indicators for the topological connection relationship and operating status level of distribution network equipment, and it is impossible to divide the distribution network into several relatively independent transformation partitions that can transmit power to each other; at the same time , due to the large number of newly-built or renovated projects in the regional distribution network, the application of the existing collaborative optimization method for optimization requires a large amount of calculation and a large number of iterations, and it is easy to produce wrong solutions

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • New construction and reconstruction planning cooperative optimization method for main equipment in power distribution network
  • New construction and reconstruction planning cooperative optimization method for main equipment in power distribution network
  • New construction and reconstruction planning cooperative optimization method for main equipment in power distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

[0033] Such as figure 1 Shown, the present invention comprises the following steps:

[0034] 1) According to the total number of newly built and renovated projects in the current distribution network planning period and the geographical wiring diagram of the distribution network with voltage levels of 110kV and below, the topological contact relationship indicators of distribution network equipment and the operating status level indicators of main equipment are set. The distribution network topology clustering transformation partition algorithm divides the distribution network into several relatively independent transformation partitions that can transmit power to each other, so as to coordinate the development of new construction and renovation projects in each partition, and at the same time improve the distribution network. Purpose of minimal impa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a new construction and reconstruction planning cooperative optimization method for main equipment in a power distribution network. The method comprises the steps that (1) an equipment topological connection relation index and a main equipment operational state level index of the power distribution network are set, and the power distribution network is divided into a plurality of reconstruction subregions through a construction subregion partitioning algorithm based on power distribution network topological structure clustering; (2) the power supply capacity, the power supply abundant degree and other indexes of the power distribution network are evaluated for new construction and reconstruction projects in all the subregions; (3) by combining the characteristics of reconstruction of the power distribution network and the characteristics of new extension projects, on the basis of the power supply capacity evaluation index of the power distribution network, a cooperative optimization objective function and a cooperative optimization mathematic model for new construction and reconstruction of the main equipment in the power distribution network are set; (4) construction time sequences of the new construction and reconstruction projects in the reconstruction subregions are subjected to random sorting to form a plurality of construction time sequence schemes for the new construction and reconstruction projects. According to the cooperative optimization mathematic model, with respect to objective function values of different time sequence schemes, the scheme with the maximum objective function value is selected and serves as a recommended scheme for the construction time sequences of the new construction and reconstruction projects.

Description

technical field [0001] The invention relates to a distribution network planning method, in particular to a collaborative optimization method for new construction and renovation planning of main equipment in a distribution network. Background technique [0002] The distribution network is an important part of the power grid, which directly faces end users and is closely related to the production and life of the masses. At present, the transformation of major equipment such as power transformation equipment, power distribution equipment, and lines in the distribution network is still at the initial stage of estimating the amount of transformation work and annual transformation plans based on the health level of equipment, and has not yet achieved the matching with power demand and grid structure. Effective connection, there are problems such as the number of scheduled power outages and the low level of economy. Distribution network planning mainly includes the planning of new...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q50/06
CPCG06Q10/0635G06Q10/06375G06Q50/06Y04S10/50
Inventor 雷体钧李红军王旭阳刘海波杨卫红吴国英江峰青胡滨
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products