Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Parallelization method for black-start sub-systems of power grid with external support

A subsystem and black start technology, which is applied in the parallel field of power grid black start subsystems, can solve the problems of black start research programs without key research and specific requirements, so as to avoid black start risks, important social benefits, and make up for calculation errors. The effect of nuclear insufficiency

Active Publication Date: 2014-03-19
STATE GRID CORP OF CHINA +2
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

As for the juxtaposition of subsystems that have already started, the above technical specifications do not make specific requirements, and the current black start research plan does not focus on research.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Parallelization method for black-start sub-systems of power grid with external support
  • Parallelization method for black-start sub-systems of power grid with external support
  • Parallelization method for black-start sub-systems of power grid with external support

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] In order to facilitate the skilled person to understand and implement the present invention, the embodiments of the present invention are now described with reference to the accompanying drawings. In order to realize the present invention, described comprises the following steps:

[0030] Step A: After the power grid is completely blacked out, according to the "Technical Specifications for the Preparation and Implementation of Power System Black Start Scheme (Trial)" and the black start research plan, divide the subsystems, and conduct black start for each subsystem;

[0031] The current power grid black start research plan is actually a black start research plan for each subsystem of the power grid. According to the above technical specifications, the power grid black start research plan divides the power grid into N black start subsystems, and investigates subsystems 1, subsystems in detail The black start research scheme of system 2, ..., subsystem N, such as figure...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a parallelization method for black-start sub-systems of a power grid with external supply, belonging to the technical field of operation and scheduling control of the power grid. Based on a black-start research scheme of the power grid, stability check of the sub-systems, voltage calculation of a parallelization circuit of the sub-systems and parallelization simulation check of the sub-systems are performed to determine a feasible parallelization route and a recommended charging direction. Starting from the sub-system with external black-start power supply support and relatively highest stability level, the parallelization with the external power grid is firstly performed, then the parallelization of the sub-systems with the external support is implemented, the parallelization with the sub-systems without the external support and with relatively high stability levels and the parallelization with the sub-systems without the external support and with relatively low stability levels are sequentially performed, and then the parallelization with the remaining sub-systems is performed to form a whole main grid frame of the power grid. According to the parallelization method disclosed by the invention, a basic method and an alternative scheme are provided for effectively restoring the main grid frame of the power grid for a scheduling and operation mechanism of the power grid, the black-start risk is avoided, the black-start success rate is improved, and the parallelization method is favorable for promoting the black-start process of the large power grid and restoring the power consumption requirements in a larger range.

Description

technical field [0001] The invention belongs to the technical field of power grid operation and dispatch control, and in particular relates to a parallel method of power grid black starter subsystems with external support. Background technique [0002] When a large-scale power outage occurs in the power grid or the power grid collapses, if the power grid recovers too slowly or collapses again during the recovery process, the power outage time of users will be prolonged and the social impact will be expanded, which will bring great losses to the national economy and people's lives, and even affect society. stable. Therefore, research on power grid black start has gradually been valued and strengthened at home and abroad. The current research on black start of power grid at home and abroad mainly focuses on three aspects: black start research plan, black start test plan and black start dispatching operation plan. Power supply and black start path selection, self-excitation a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/38
CPCH02J3/38H02J2203/20Y02E60/00Y04S40/20G05B17/02
Inventor 徐敬友常青王春明许汉平徐友平李继升黄大玮熊秀文
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products