Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of tunnel shock relieve hole controlling blasting

A technology for controlling blasting and construction methods, applied in blasting and other directions, can solve problems such as large vibration of upper buildings and pipelines, damage to buildings and pipelines, etc., to reduce damage, reduce blasting vibration speed, and achieve good blasting effects.

Active Publication Date: 2013-06-26
中国建筑土木建设有限公司
View PDF5 Cites 31 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a construction method for controlled blasting of tunnel damping holes, to solve the problem that through the existing blasting construction method, large vibrations will be generated on the upper buildings and pipelines, so that the buildings and pipelines are under construction. Technical issues that disrupted

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of tunnel shock relieve hole controlling blasting
  • Construction method of tunnel shock relieve hole controlling blasting
  • Construction method of tunnel shock relieve hole controlling blasting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] Examples see Figure 1 to Figure 4 As shown, among them, figure 2 In the middle, the solid round holes in the peripheral eye area, auxiliary eye area and cut eye area are the peripheral eye, auxiliary eye and cut hole in turn. The number indicates the rank of the detonator outside the hole.

[0032] A construction method for controlled blasting of damping holes in a tunnel, the steps of which are as follows:

[0033] Step 1, arranging the first row of damping holes 3 along the center line of the excavation contour line 1 on the face of the upper step;

[0034] Step 2, setting the second row of shock-absorbing holes 4 inwardly from the center line of the first row of shock-absorbing holes 3; Step 3, setting the third row of shock-absorbing holes 5 on the periphery of the cut eye area 7;

[0035] Step 4, arranging peripheral eyes in the peripheral eye area 2, the peripheral eyes are arranged at intervals with the first row of shock-absorbing holes 3, cutting holes are...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method of a tunnel shock relieve hole controlling blasting. Shock relieve holes are circumferentially distributed in the peripheries of an upper step arch part and a slotting zone, and a row of inner shock relieve holes and a row of outer shock relieve holes are especially formed in periphery hole zone of the upper step arch part, presplitting belt width of the periphery holes after blasting is increased, presplitting effect is strengthened, meanwhile through separating and cutting function of the shock relieve holes, explosive load is lowered, earthquake stress is reduced, and thus the target of reducing blasting vibration velocity is achieved. The construction method of a tunnel shock relieve hole controlling blasting can be widely applied to blasting construction in a tunnel mining construction, and especially to a city flourishing area and an area with a plurality of pipelines.

Description

technical field [0001] The invention relates to a tunnel excavation construction method, in particular to an underground excavation construction method using blasting construction. Background technique [0002] As the country advocates vigorously developing public transportation, subway projects are widely constructed in large and medium-sized cities across the country. The commonly used construction methods for subway projects include shield tunneling method, open excavation method, concealed excavation method, cover excavation method, caisson construction method, etc. The construction method to be adopted shall be determined according to the surrounding construction environment, the soil mass of the excavation site and the project cost. For economic considerations, the underground excavation method is widely used in subway tunnel construction in our country. During underground excavation construction, blasting operations are required in hard rock formations. However, if t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F42D1/00F42D3/04F42D5/045
Inventor 肖龙鸽孙贵华杨昆鹏傅启路张海波
Owner 中国建筑土木建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products