Method for evaluating economy of differential planning of electric system
An economical and differentiated technology for planning, applied in electrical digital data processing, data processing applications, instruments, etc., which can solve the problem of insufficient consideration of special operation modes, incomplete application of economic evaluation, long-term power grid planning and time factors of funds Insufficient consideration, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0078] An economic evaluation method for differentiated planning of a power system, which conducts economic evaluation at the equipment level (single unit) to Figure 4 Take the Garver6 node calculation model as an example. Include the following steps;
[0079] Step 1. Determine the core backbone grid; clarify the operation mode in the disaster scenario after the differentiated planning of the power grid. In the disaster scenario, the grid structure is composed of differentiated lines, that is, only the core backbone grid is left for stable operation;
[0080] Mainly considering the impact of ice and snow disasters, it is determined that the important lines in the example model are 3-5, 2-6, and 4-6, all of which are new differentiated lines, and the lengths are 20km, 30km, and 30km respectively. The once-in-a-year ice disaster is raised to resist the ice disaster that occurs once in 50 years or once in a century. The disaster scenario is that when an ice disaster exceeds the...
Embodiment 2
[0147] An economic evaluation method for differentiated planning of a power system, which conducts system-level (multi-equipment) economic evaluation to Figure 4 Take the Garver 6-node calculation model as an example.
[0148] Carry out differentiated planning for three important lines at the same time, the typical scheme is as follows, Image 6 (a), (b), (c), and (d) correspond to schemes (1), (2), (3), and (4) respectively:
[0149] Scheme (1) The design standards of the three lines are all raised to resist the ice disaster that occurs once in 50 years.
[0150] Scheme (2) The design standards of lines 3-5 and 2-6 are raised to resist ice disasters once in 50 years, and lines 4-6 are raised to resist ice disasters once in 100 years.
[0151] Scheme (3) The design standards of lines 3-5 and 2-6 are raised to resist ice disasters once in 100 years, and lines 4-6 are raised to resist ice disasters once in 50 years.
[0152] Scheme (4) The line design standards are all raised ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com