Construction process for overhead back-up movement and dismantlement of movable shuttering form
A technology of moving formwork and construction technology, applied in the field of bridge construction technology, can solve the problems of large damage to concrete box girder and waste of time, and achieve the effect of saving demolition time and avoiding multiple transfers of demolition equipment.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] like figure 1 , figure 2 As shown, the demolition process of moving formwork in the air, including the rear guide beam 1, the main beam 2, the front guide beam 3, the corbel 4, the trolley 5, the outer formwork 7, the formwork beam 8, and the middle beam that need to be removed on both sides of the bridge 9. The corbel pair pulls the fine-rolled rebar 13; use the trolley 5 to move laterally from the corbel 4 to open the mobile formwork, install the hoist 11 on the concrete box girder, and use the hoist 11 and the car crane to pull the 10 to remove the outer formwork 7 , remove the formwork beam 8 and middle beam 9 from top to bottom in turn, leaving only the rear guide beam 1, main beam 2 and front guide beam 3, then remove the main beam 2 of the mobile formwork, and finally remove the last section of the main beam 2 and the front guide beam 3.
[0017] Remove the main beam 2 of the mobile formwork (excluding the last main beam 2) as image 3 , Figure 4 shown. Fi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com