Measurement and installation method of plate-type ballastless track primary standard

A slab-type ballastless track and installation method technology, which is applied in the direction of track, measuring instrument, track maintenance, etc., can solve the problems of too many measurement links and measurement transmission, no fine-tuning function of the steel plate, complex and complicated installation procedures, etc., and achieve the reduction of material machinery Cost, reduction of measurement links, and the effect of less measurement links

Active Publication Date: 2010-07-07
CHINA RAILWAY NO 8 ENG GRP CO LTD
View PDF0 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0013] The defect of this method is: 1, adopt the bolt anchoring process, need to drill on the groove, use the bolt to anchor the reference device, the cost is high
2. Obtain the elevation coordinates of the datum device by leveling and auxiliary points on the top surface of the convex block; obtain the plane coordinates of the datum device by using the wire measurement method; use the angle measurement of theodolite and the positive vector measurement of the tension line to check the smoothness of the datum device; In this way, there are too many measurement links and measurement transmissions, which increases the error, complicates the installation process, and reduces work efficiency.
[0015] The main defects of this method are: 1. The steel plate is embedded in advance and has no fine-tuning function; 2. The elevation and plane position of the steel plate are measured by wire, and the measurement accuracy is not high
[0016] At present, there is no measurement and installation method of a plate-type ballastless track datum that can successfully overcome the defects in the above-mentioned methods.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Measurement and installation method of plate-type ballastless track primary standard
  • Measurement and installation method of plate-type ballastless track primary standard
  • Measurement and installation method of plate-type ballastless track primary standard

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0065] All the features disclosed in this specification, or all disclosed methods or steps in the process, except for mutually exclusive features and / or steps, can be combined in any manner.

[0066] Any feature disclosed in this specification (including any additional claims, abstract and drawings), unless specifically stated, can be replaced by other equivalent or alternative features with similar purposes. That is, unless otherwise stated, each feature is just one example of a series of equivalent or similar features.

[0067] Such as figure 1 The measurement and installation method of CRTS I type ballastless track datum includes the following steps:

[0068] Operation preparation includes the following steps: collect CPIII plane and elevation data and related route design files; input design route parameters to generate datum theoretical coordinate data; investigate the position of plane and elevation control points, and design datum Measure and set up the plan, compile the work...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a measurement and installation method of a plate-type ballastless track primary standard, comprising the following steps of preparing job, preliminarily locating and measuring a primary standard, anchoring the primary standard, carrying out three dimensional coordinate measurement on the primary standard, adjusting the primary standard, carrying out plane re-check measurement and smoothness check on the primary standard, carrying out altitude re-check measurement on the primary standard and sealing the primary standard. The method has small measurement transfer error, high precision, few intermediate job links of the measurement, high work efficiency, material saving and simple, convenient and rapid operation.

Description

Technical field [0001] The invention relates to a method for measuring and installing a ballastless track datum, in particular to a measuring and installing method for a CRTS I plate type ballastless track datum. Background technique [0002] With the advent of my country’s high-speed railway construction climax, the traditional ballast track has reached the limit of its carrying capacity under the long-term load of high-speed trains. The track smoothness has deteriorated, the amount of maintenance operations has increased, and the available maintenance time has become more and more. Less, seriously hindering the development of high-speed railway. [0003] At present, the domestic railway passenger dedicated lines basically adopt ballastless tracks. There are two main forms of ballastless tracks: double-block ballastless track and slab ballastless track. Slab ballastless track is mainly classified into CRTS I slab ballastless track and CRTS II slab ballastless track. CRTS I type s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01B35/00
Inventor 赵智谢录杲秦瑞谦王智勇白昆华龚斯昆赵代强梅红肖肃宇万轶宋德佩杜建武
Owner CHINA RAILWAY NO 8 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products